Permit: T00CM03265

Parcel: 11522002A


Addresses:

1390 W SPEEDWAY BL


Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Permit Number - T00CM03265

Inspection Description - ELECTRIC - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
05/14/2002 ELECTRIC - FINAL Approved IVRS - Inspection 0000*OK FINAL.
05/09/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*BUILDING ROOF. 1.) RECEPTICALS ARE TO BE WEATHER PROOF WHEN PLUGED AND UNATTENDED 410-57. PV SYSTEMS 1.) GROUND LUGS CANNOT BE STACKED 110-3. TRANSFORMER NEUTRAL TO BE BONDED TO GROUND. 4.) PLEASE TIGHTEN LOOSE FITTINGS. 5.) CLOSE NIPPLES APPEAR TO NOT BE ELECTRICAL NIPPLES ALSO LOCKNUTS ARE NEEDED BOTH SIDES TO MAINTAIN MECHANICAL. 6.) WE HAVE LOOSE SEAL TITE FITTINGS.
04/18/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*
03/28/2002 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection 0000*A REFEE MAY BE ISSUED NEXT TIME IF CORRECTIONS ARE NOT MADE.
03/27/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*1. PLEASE LABEL PANEL "OF". 2. PANEL "OF" NEED A MAIN BREAKER PER CODE 225-32.
01/27/2002 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*ROOF 1.) ARRAYS TO BE PROPERLY GROUNDED SHEET METAL SCREWS ARE NOT ALLOWED AND CONDUCTOR TO BE UNDER SCREW 3/4 OF A TURN JUNCTION BOX STAND NEED TO BE SECURED TO SUPPORT THE BOX.3.) WE HAVE A LOOSE FITTING AT THE JUNCTION BOX SEALTITE.
12/30/2001 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection 0000*PLEASE RESCHEDULE WHEN PHOTO CONTRACTOR CAN BE PRESENT.
12/13/2001 ELECTRIC - FINAL Partial Approval NOT READY SEE BELOW PARTIAL OK ON CLASSROOM OK TEMP C OF O. 2ND FLOOR. TONY RICHARD HOLLINGER WILL BE THE ONE TO GIVE YOU THE FINAL, STILL NO PERMIT FOR PHOT VOTALE EQUIPMENT ON ROOF A FINAL WILL NOT BE ISSUED UNTIL THAT TAKES PLACE IF YOU WANT A TEMP C OF O. FOR 2ND FLOOR CALL ME.
12/10/2001 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*PARTIAL OK TEMP C OF O 1ST.
12/07/2001 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*1.) VERIFY PERMIT AND PLANS FOR PHOTO VOLTAIC WORK.
12/06/2001 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*OK RECEPTION COUNTER.
12/05/2001 ELECTRIC - FINAL Partial Approval IVRS - Inspection 0000*1.) FINISH FLOOR BOXES 2.) FINISH OUTLET BOXES 3.) SECURE TAIL END OF GROUND IN STORAGE ROOM 4.) SUPPORT CONDUIT AS PER CODE STORAGE ROOM 5.) LABEL DISCONNECTS 6.) FILL UNUSED OPENINGS MECH ROOM #125: 7.) USE APPROVED FITTINGS FOR CONNECTION TO LB. 8.) WORKING CLEARENCE FOR DISCONNET. 9.) DOUBLE LUGGING OF GROUNDS 10.) CANNOT USE SHEET METAL SCREW FOR GROUNDING 11.) SUPPORT CONDUIT AS PER CODE. 12.) CHECK TRANS FORMER FOR CONNECTIONS.OK ROOM #102-109,126,127,110-112,116-118,120-123