Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/25/2000 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 10/20/2000 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. 1/2" A BOLTS REQ'S AT SHEAR WALLS H1LT1 PINS NOT SEEN ON PLAN AS AN OPTION. 2. KEEP PEX H20 12" FROM CAN LIGHTS 3. NEED H20 PRESS TEST 4. SHEAR TRANSFER NOT CONNECTED #3 SHEAR REAR BEDROOM INSTALL A BOLTS (ALL SHEAR WALLS). 5. FLEX DUCT COME APART W/CLOSET ROOM DIFUSSER 6. ELECT NOT DONE. |