Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 09/06/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
IVRS - Inspection 0000*/OK TO CONTINUE TO INTERMEDIATES. SHEAR WALL AT 2ND BATH NEED TRANSFER. |
| 09/01/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
1. NAILS AT POST TO BEAM GLUE LAMB NOT INSTALLED. 2. PROTECT EXTERIOR AT ABS ELEC PROVIDE 16 GA STRAP AT SOLE PLATE. 3. PROVIDE DBL STUDS UNDER GIRDER ENTRY 4. DETAIL 10/D1 NOT INSTALLED AS PER PLAN. 5. ENGINEERED PLAN SPECIFICALLY STATES SIMPSON HARDWARE TO BE USED ADVANCED SYSTEM CONNECTORS HAVE BEEN INSTALLED SAME ON LOT 31. REVISE CHANGE OR OMMIT APPROVED DRAWINGS COVER AT YOUR OWN RISK. |
| 08/31/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999*/1. ENTRY BEAM POST NOT COMPLETE. 2. PROVIDE DETAIL 10/D1. 3. SEE NOTE FROM LOT 31 APPLY TO #33, ALSO SEE ED. |