Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2001 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
| 04/13/2001 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*OK TO CLEAR TEMP POWER,CALL FOR FINAL WHEN ELECTICAL SYSTEM IS CHECKED OUT BY CONTRACTOR. | |
| 04/12/2001 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* 1) THE SUB PANEL MUST BE MARKED "L3" 2) THE MAIN SWITCH FEEDING THE PANEL MUST BE MARKED "TO PANEL L3" 3) THE GROUND LUG AT THE METER WAS SET OVER A PAINTED SURFACE. REMOVE, SCRAPE PAINT TO BARE METAL AND RE TERMINATE LUG. 4) REMOVE THE GROUND BOND STRAP AT SUB PANEL 5) ENERGIZE SERVVICE FOR HOT TEST OF ADDN. |
|
| 04/03/2001 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000*CALL FOR SERVICE |