Inspection History Details
Inspection Status: Compliance
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2001 | BUILDING - FINAL | Compliance | A LETTER FROM JOSEPH RUTKOWSKI OF THE OFFICE OF MANUFACTURED HOUSING, DATED MARCH 23, 2001, INDICATES THAT THE CORRECTION ITEMS ARE3 UNDER THE JURISDICTION OF HIS OFFICE. LETTER IS IN RECORDS. | |
| 03/27/2001 | BUILDING - FINAL | Partial Approval | IVRS - Inspection 0000* 1) PERMIT FOR RACKS PER I.G.A. WITH U OF A 2) THE 1 HR FIREWALL IS APPROVED BY OFFICE OF MANUFACTURED HOUSING PER FAX FROM JOSEPH D. ROTKOWSKI, SEE ATTACHED. 3) SYNTHETIC STUCCO APPROVED BY OFFICE OFMANUFACTURED HOUSING PER FAX REFERENCED ABOVE 4) ADDRESS TO BE POSTED WITH 15" NUMBERS TOWARD VALENCIA. OK FOR TEMP C OF O | |
| 09/19/2000 | BUILDING - FINAL | Not ready for Inspection | PERMIT FOR RACKS RACK ANCHORS NOT PER PLAN PLANS AT EAST END OF BLDG AT SERVICE PANEL NO SPECIAL INSP REPORT FOR WELDING REPORT FROM U OF A INSP FOR 1-HR WALL PROVIDE A COMPLETE SET OF APPROVED PLANS CITY APPROVED PROVIDE PERMIT FOR SPRINKLER SYSTEM PROVIDE A DATED INSTALLERS CERTIFICATE FOR SYNTHETIC STUCCO SYSTEM POST ADDRESS W/15" NUMBERS TOWARD VALENCIA U OF A MODULAR BLDG SEE STEVE LING 8-9 AM BRIAN 602-372-2000 |