Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2001 | PLUMBING - ROUGH, SOIL | Approved | ||
| 09/27/2000 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1. SOIL WATER TEST OK 2. BLDG SEWER IS STUBBED OUT OF FOOTER AT NORTH SIDE OF BLDG. WHRE C.O. IS LOCATED ONLY 3. WILL REQUIRE REVISED AND APPROVED DRAWING ON WASTE AND VENT SYSTEM BEFORE FINAL INSPECTION FOR RM # 179, 180 4. OK TO BACKFILL TRENCH |