Inspection Status: Denied
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/17/2002 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*/ 1) NO ACCESS |
| 04/25/2002 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*/ 1) APPROVED PLANS AND PERMITS REQUIRED TO BE ON SITE 2) ALL PIPING MUST BE SUPPORTED ON SOLID SOIL 3) LONG SWEEP 90 DEGREES MUST BE USED FROM HORIZONTAL TO VERTICAL 4) 3" LINES AND SMALLER MUST HAVE A MINIMUM OF 1/4" PER FOOT SLOPE 5) EXPOSE PIPING TO VERIFY CONNECTION TO PRIVATE AND PUBLIC SEWER SYSTEM |