Inspection Status: Not ready for Inspection
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/31/2000 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. FOUNDATIONS PLACED AND POURED WITHOUT INSPECTIONS. 2. MASONRY INSTALLED WITHOUT INSPECTIONS. 3. INTERIOR BEAMS PLACED IN MASONRY WITHOUT HOLD DOWNS. 4. STEEL PRIMARY SUPPORTS CUT AND LOADED ON TOP OF BEAM WITHOUT CONNECTIONS. 5. PLANS DO NOT REFLEX WORK PERFORMED ON HOUSE. 6. HOUSE IS OCCUPIED BY OWNER WHO WILL PROCEED WITHOUT INSPECTIONS. HOMEOWNER WAS ONLY LOOKING FOR 180 EXTENSION. |