Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/21/2000 |
BUILDING - FINAL |
|
Approved |
|
| 08/18/2000 |
BUILDING - FINAL |
|
Denied |
1. CLEANOUT NOT INSTALLED AS PER PLAN FOR OPTIONAL LAUNDRY SINK. 2. ANTI TILT DEVICE NOT INSTALLED. 3. SECURE DISHWASHER WASTE LINE TO WITHIN 2 INCHES OF SINK FLOOD RIM PROVIDING AIR GAP. 4. STUDY ROOM NOT IDENTIFIED ON PLAN. PLAN INDICATES 3RD BEDROOM NO SMOKE DETECTOR PROVIDED. |