Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T00CM02100
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2001 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000* CORRECTIONS HAVE BEEN MADE | |
02/07/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
02/01/2001 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection 0000* | |
01/31/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* BOND HAS BEEN POSTED FOR TEMP POWER OR GAS 19510352.1113BCM WILL NEED PLAN REVISION AT TIME OF FINAL FOR GAS VALVE AND LOCATION OF ROOF DRAIN AND OVERFLOW DRAIN TERMINATION OK FOR TEMP C OF O CORRECTIONS HAVE BEEEN MADE ON GAS TEST OK NEED APPROVED FROM FIRE BOND HAS BEEN POSTED |
|
01/29/2001 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* FLEX CONNECTOR AT WATER HEATER TOO LONG SEE TABLE 12-10 94 UPC SUPPORT GAS PIPING ABOVE CEILING PLEASE CHECK ALL OVERHEAD PIPE FOR MINIMUM STRAPPING DRAIN FROM ICE MAKER NOT ACCEPTABLE CHECK ALL AIR GAPS FOR MINIMUM CLEARANCE INDIRECT WASTE PIPING 5'-15 NEEDS TO BE TRAPPED INSULATE HOT WATER LINES PROVIDE APPROVED DRAWINGS FOR ADDITION OF URINAL PROVIDE APPROVED DRAWINGS FOR WATER HEATER RELOCATE PROVIDE CERTIFICATION FOR BACK FLOW DEVICES CHECK ALL WORK I DON'T MAKE PUNCH LISTS |
|
01/29/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* GAS REMOVE UNION PROVIDE RIGHT LEFT NIP CUP ANCHOR ALL WATER LINES PROVIDE 16 SIDE CLEARENCE PAINT CONDENSATE LINES SEE PLAN FOR APPROVED CONDENSATE LINES PVC SEE PLAN ON ROOF DRAINS EXTEND TO CURB INDIRECT WASTE LINES TESS ALL BACKFLOW DEVICES |
|
01/25/2001 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* PLEASE HAVE PLUMBER REWIEW CONTRACT DOCUMENTS AND INSTALL PER PLAN COMPLETE ALL WORK BEFORE CALLING IN FOR INSPECTION |