Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2002 |
ELECTRIC - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000*ENTRY NORTH, HALLWAY AREAS STAGE ROOM #1 AND #2 OK TO COVER CEILING. 2.) WATER BOND FINISH CLAMP TO LINE GAS BOND OK. |
| 08/02/2002 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
OK BATHROOMS EXCEPT AT ACCESS OPENING FINISH CONDUITS FOR ACCESS CLEARENCE. |
| 07/31/2002 |
ELECTRIC - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000*NEEDS OK ON AC DISCONNECT INSTALLED IN HORIZONTAL POSITION BECAUSE OF BLADES. |
| 07/29/2002 |
ELECTRIC - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) ACCESS WILL BE NEED TO BE AVAILABLE AFTER DRY WALL. A PLATFORM ABLE TO SUPPORT WEIGHT IS NEEDED FOR WORK A/C DISCONNECT. 2.) PLEASE SUPPORT CONDUIT WITHIN 3' OF BOXES. |