Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2001 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection 0000*1.) OK ON REVERSE FEED TRANS PER RMS. OFFICE THUR 2.) DESION IN EQUIPMENT ROOM FOR TRANSFORMER OK PER FERNANDO GALVEZ MONRAD ENGINEERING EXTRA ON JOB. 3.) OK ON CHANGE OF FUSED DISION TO CV WITH SHUNT TRIP FOR X-RAY ON INSTALLERS APPROVAL THUR OFFICE. 4.) OK ON 1-3" RIGID & 3-2 RIGID CONDUIT IN X-RAY ROOM. | |
| 07/27/2001 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1. 1/4" CONDUIT TO X-RAY RM 1.) CHANGE U.G. CONDUIT TO STEEL (SPEC. 2.) TRANSFORMER TO BE RATED PRIMARY 208 AND SECONDARY 480V. 3.) PLEASE CHECK ONE LINE FOR X-RAY DISCONNECT. | |
| 07/26/2001 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*WALK APPROVED FOR X-RAY ROOM. | |
| 05/30/2001 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* | |
| 05/11/2001 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* NOT READY | |
| 05/09/2001 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) ROUGH ALL WALLS AND CEILINGS EXCEPT DARK ROOM/CHEMICAL STORAGE AREA AND X-RAY ROOM 2) UNDER GROUND APPROVAL TO RECEPTION 3) GAS BOND X-OTHERMIC WELD APPROVED | |
| 05/04/2001 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* COMPLETE SWITCH LEGS | |
| 05/02/2001 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* ALL EXTERIOR PERIMETER WALLS | |
| 04/30/2001 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0245* 1) GAS BOND X-OTHERMIC WELD COVERED, UNDER SLAB NOT APPROVED 2) 2 1/2" AND 1 1/2" CONDUIT COVERED UNDER SLAB NOT APPROVED 3) PERIMETER EXTERIOR WALLS NOT APPROVED NEED WIRE PROTECTOR PLATES THROUGHOUT. ANYWHERE YOU ARE 1 1/4 OR LESS FROM FACE OF STREET |