Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2000 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. SOIL WATER TEST OK 2. HCS CONNECTION OK 3. YARD WATER LINE FROM METER TO BLDG OK 4. OK TO BACKFILL TRENCH 5. NOTE: WILL REQUIRE REVISED AND APPROVED DRAWING ON WASTE AND VENT IZO ON TUBS. PRIOR TO FINAL |
| 04/19/2000 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - DENIED - 1. SEWER LINE BETWEEN CLEANOUTS AND HCS IS NOT PROPERLY SUPPORTED/SHADED. 2. PLUMBING IS NOT PER PLAN. BUILD TO PLAN OR REVISE PLAN TO AS BUILT AND HAVE APPROVED BY THE CITY OF TUCSON. |
| 04/19/2000 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999* |