Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T00CM01637
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2002 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
10/14/2002 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*1.) MAINTAIN 3' OF WORKING CLEARENCE INFRONT OF ALL A/C DISCONNECTS UP IN MECHANCIAL. 2.) LABEL DISCONNECTS AS TO WHAT THEY CONTROL. 3.) ADDITIONAL LIGHTING IS NEEDED TO COVER WORKING AREAS. | |
10/03/2002 | ELECTRIC - FINAL | Partial Approval | SENT TO TEP 10/4/02 AT 9:15 AM OK TEMP POWER FOR TEST. | |
09/04/2002 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*1.) PLEASE INSTALL CIRCUIT DIRECTIORIES AND LABEL BREAKERS 2.) ALL STRANDS OF CONDUCTOR TO BE TERMANANTED UNDER LUGS 3.) VERIFY WET/DAMP LOCATION FOR FIXTURE IN SHOWER AREA. 4.) FINISH UPSTAIRS MECHANICAL ROOM. PLEASE HAVE NEW ELECTRICAL CONTRACTOR SUBMIT A LETTER VERIFYING LIABILITY FOR WORK DONE ON THIS JOB. ALSO HAVE NAME ADDED TO PERMIT RECORDS. | |
08/27/2002 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*1.) RECESSED CANS AT ENTRY TO BE ATTACHED TO GRID AND A SUPPORT WIRE IS NEEDED. INSTALL TRIMS FOR FINAL. 2.) WE HAVE CONDUCTOR OVER FILL IN JUNCTION BOXES. 3.) IDENTIFY CONDCUTORS AS ON GROUNDED COLORS 4.) A DISCONNECTING MEANS IS NEEDED FOR WATER HEATER 5.) FINISH INSTALLATION OF GRABAGE DISPOSAL PLUG. 6.) BONDING TO BE SIZED PER CODE 250-102. 7.) HUBS TO BE LISTED FOR USE WITH CT CAN. 8.) TIGHTEN ALL TERMANAL CONNECTIONS. 9.) TIGHTEN SEALING LOCK NUTS. 10.) NEED FUSES AND REJECTION CLIPS INSTALLED 11.) PERMANENT DISCONNECT LABELS ARE NEEDED ALSO METER LABEL. 12.) PLEASE HAVE LICENSED ELECTRIC CONTRACTOR PROVIDE A LETTER ON COMPANY LETTER HEAD VERIFYING TORQUE VAVLES ON SERVICE CONDUCTORS. |