Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2000 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - ITEMS 1 & 4 TAKEN CARE OF ITEMS 2&3 NEED TO BE COMPETED 2. ITE BREAKERS IN A CROUSE AWDS PANEL 3. HEAT UNITS LABELED AT RAMP EA TOTAL 24 AMP ON A I5 AMP CIRCUIT BREAKER. 4. NEED FILLER BLANKS IN PANEL FALIURE TO CORRECT BEFORE NEXT INSPECTION WILL RESULT IN A REFEE. LOCK BOX CODE HAS BEEN CHANGED CALL NANCY BEFORE GOING NANCY. 749-2090. |
| 05/08/2000 |
PLUMBING - FINAL |
|
Denied |
DENIED |
| 04/06/2000 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. NO ACCESS TO BLDG 2. NOT READY ON TEST APROX 1 1/2 LBS ON GAUGE AT THIS TIME PLEASE PROVIDE A MIM OF 10 LBS ON COMPLETE SYSTEM AT TIME OF INSPECTION 3. PLEASE PROVIDE APPROVED DRAWING WITH TOTAL LENGHT AND TOTAL BUTS AT TIME OF INSPECTION. 4. CALL AGAIN ONLY WHEN READY AND PROVIDE ACCESS FOR INSPECTION. |
| 04/06/2000 |
PLUMBING - FINAL |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |