Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2000 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000* ALL CORRECTIONS MADE |
|
| 10/20/2000 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* BACKFLOW PROTECTION NOT COMPLETE GAS EQUIPMENT NEEDS TO BE HOOKED UP 3 COMP SINK 1. VEGETABLE PREP SINK SPLASHES 2. INSTALL 2" FLOW CONTROL AND VENT ABOVE OVERFLOW CRITICAL LEVEL ON URINAL MINIMUM 6" ABOVE TOP OF URINAL CONDENSATE TRAP INLET AND OUTLET AT SAME LEVEL PLEASE PROVIDE 2 PIPE DIAMETER DIFFERENCE |
|
| 10/16/2000 | PLUMBING - FINAL | Not ready for Inspection | NOT READY AT THIS TIME COURTESY WALK THRU TO HEAD OFF ANY PROBLEMS |