Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2001 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000* 1) WASTE AND VENT SYSTEM OK 2) ALL CORRECTIONS HAVE BEEN MADE 3) OK TO DRY WALL UPON BLDG INSP APPROVAL | |
| 02/06/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* MUST USE SPECIALTY COUPLINGS WHEN TRANSITION IS MADE FROM ABS TO C.I. MUST HAVE DIRECTIONAL FITTINGS WHEN EXTENDING C.O. 2" HORIZONTAL VENT EXCEEDS MAX DISTANCE FOR FLOOR SINK AT SODA FOUNTAIN MUST HAVE REVISED AND APPROVED BEFORE NEXT INSPECTION MUST HANG ABS HORIZONTAL VENTS EVERY 4'-0" P.O.C. OF BLDG DRAIN TO BLDG SEWER OK |
|
| 12/21/2000 | PLUMBING - INTERMEDIATE | Partial Approval | RE ALIGNMENT OF P-1 OK 2" COPPER WASHER SERVICES STUBED INTO BUILIDNG OK |