Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/13/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 05/24/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) GAS LINE PROPERLY INSTALLED IN UTILITY TRENCH-YOU MUST REVISE GAS LINE TO HOBBIE SHOP PER 5/23/01 INSPECTION, OK TO FILL TRENCH |
| 05/23/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) SEWER AND WATER LINE OK-REVISE PLAN FOR ADDED GAS LINE TO INCLUDE SIZE, LENGTH AND LOCATION AND HAVE APPROVED BY CITY OF TUCSON 2) POLY GAS LINE MUST BE DEEP ENOUGH TO HAVE 18" OF COVER INSTALLED, PRESSURE TEST OK 3) OK TO CONTINUE WITH ADDITION BUT DO NOT COVER GAS LINE 10' FROM EACH END |