Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2003 | ENGINEERING - FINAL | Approved | ||
| 08/06/2003 | ENGINEERING - FINAL | Denied | COMPLETE ITEMS LISTED ON 2-7-03 INSPECTION REPORT. | |
| 02/07/2003 | ENGINEERING - FINAL | Denied | COMPLETE THE FOLLOWING: 1) PROVIDE ALL PAVED SURFACES TO THE SITE PLAN SPECIFICATIONS. 2) PROVDE WATER HARVESTING AREAS AND DRAINAGE AREAS THAT ARE CLEARLY DEFINED. 3) REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS. 4) VERIFY THAT ALL PARKING SPACES AND SIGNS ARE IN PLACE AND STRIPED. |
|
| 01/06/2003 | ENGINEERING - FINAL | Denied | PLEASE PROVIDE ALL WORK SHOWN ON THE SITE PLAN TO INCLUDE ALL EXTERIOR WORK COMPLETION. |