Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T00CM01093
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2000 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 07/13/2000 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0999* 1. NO APPROVED DRAWINGS ON SITE AS REQUESTED 2. MUST PAY REINSPECTION FEE BEFORE NEXT INSPECTION |
|
| 07/10/2000 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0999* 1. MUST HAVE AGA GAS SHUT OFF VLAVE AT METER MANAFOLD, AS REQUESTED 2. SEE NOTE #3 AS REQUESTED |
|
| 06/13/2000 | PLUMBING - GAS PRESSURE TEST | Correction Required | ADDTL COMMS - 1. MUST USE AGA APPROVED SHUT OFF VALVES 2. GAS SHUT OFF VALVES MUST BE INSTALLED AT MAX 3-0 FROM REGULATORS 3. MUST PROVIDE APPROVED DRAWING FOR GAS LINE SYSTEM ON SITE | |
| 06/13/2000 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0000* |