Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T00CM01081
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2002 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000*1.) COLUMN " K" 15 UNDERGROUND OK WATER TEST OK OK TO COVER THIS COMPLETE THE UNDERGROUND 2.) 2ND & 3RD FLOORS "K" 4-15 OK WATER TEST OK 3.) TRENCH DRAIN "L" 1.5 COLUMN 8 OK 4.) WILL LOOK AT WATER LINE ON FINAL. | |
| 02/01/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) CHANGE ORDER R-160 COLUMN K-L8-14 4",6" N/H DRAINS OK WATER TEST OK OK TO COVER. 2.) L/"6" 8"10" N/H COLUMN "K" 10-15 OK OK TO COVER, WATER TEST OK 3.) TIE-IN TO STORM DRAIN AT "K" 3 OK OK TO COVER. 4.) 2ND & 3RD FLOOR COLUMN "H" 4-15 OK WATER TEST OK. | |
| 01/31/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* | |
| 01/28/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*TIE IN TO STORM DRAIN AT SOUTH END OF COLUMN "H" | |
| 01/25/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) 4",6",8",10",12" STORM DRAIN FROM 8-15 ALONG COLUMN "H" OK 2.) NEED TO SEE CONNECTION TO MAIN AT SOUTH SIDE OF "H" 3.) DRAIN INSTALLED PER ENGINEERS CALCULATIONS 4.) OK TO BACKFILL. | |
| 01/15/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) TIE-IN TO STORM DRAIN ALONG COLUMN LINE "H" OK. | |
| 01/13/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) INTERMEDIATE ABOVE GRADE PIPING FOR ROOF DRAINS SECOND AND THIRD FLOORS. COLUMN LINE "F" 1-14. N/H OK WATER TEST OK 2.) ROUGH/SOIL 4",6",& 8" N/H UNDERGROUND COLUMN LINE "H" 2.5 - 6 OK WATER TEST OK OK TO BACKFILL NEED TO SEE FINAL CONNECTION TO STORM DRAIN. | |
| 01/04/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) 4", 6",8" & 10" N/H ROOF DRAINS UNDERGROUND ALONG COLUMN LINES 8/14.0K WATER TEST OK. OK TO TIE-INTO STORM DRAIN. OK TO BACKFILL. | |
| 09/07/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | ROOF DRAINS COLUMLINE "F" 2-6. 1.) 4" N/H TO 6" N/H TO 8" N/H OK 2.) WATER TEST TO FIRST FLOOR OK 3.) TIE IN TO STORMDRAIN OK 4.) OK TO COVER THIS AREA. | |
| 07/31/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | 1.) ALL RAIN LEADERS ALONG SOUTH WALL OF RACK BLDG OK TO 10' 2.) TIE-INS TO STORM DRAIN OK 3.) OK TO COVER. | |
| 05/08/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) COLUMN E-13 8" N/H RAIN LEADER AND TRENCH DRAIN RISER OK 2) WATER TEST OK 3) TIE IN TO 56" STORM DRAIN OK 4) OK TO BACKFILL |
|
| 04/17/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1. OVERHEAD COPPER ALL THREE LEVELS IN PARKING GARAGE OK, OK TO INSULATE, PRESSURE TEST OK 2. TIE IN TO 56" AT B-15 OK 3. TEST & TIE-IN AT C-15 OK, OK TO COVER | |
| 04/10/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* | |
| 04/04/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | 1) COLUMN LINE "B" ONE THROUGH SIX 4", 6", &8" N/H CAST IRON OK(RAIN LEADERS) 2) WATER TEST TO CLEAN OUT ON COLUMN OK 3) OK TO BACKFILL 4) WANT TO SEE CONNECTION OF 8" TO 54" |
|
| 03/29/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) COLUMN LINE "D" 12 TIE IN 10" N/H TO EXSISTING STROM DRAIN OK 2) OK TO COVER |
|
| 03/27/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) COLUMN LINE "D" GRID LINES 6-14. 4",6",8", 10" N/H RAIN LEADERS UNDER GROUND OK 2) NEED TO SEE FINAL CONNECTION TO MAIN 3) OK TO COVER THIS AREA | |
| 03/23/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) GRID LINE 2-6 COLUMN LINE D 6" AND 8" N/H ROOF DRAIN LEADERS UNDER GROUND OK 2) OK TO BACKFILL |