Permit: T00CM01081


Addresses:

7275 S TUCSON BL


Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T00CM01081

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/25/2002 BUILDING - FINAL Approved IVRS - Inspection 0000*SPECIAL INSPECTIONS REVIEWED AND ACCEPTED. OK FOR C OF O.
07/12/2002 BUILDING - FINAL Denied IVRS - Inspection 0999*PROVIDE COPIES OF FINAL COMPLIANCE FROM PLUMBING, ELECTRIC AND ENGINEERING INSPECTOR/ 1.) WEATHER PROOF AROUND OUTLETS LEVELS 1,2,3, NW ELEV SHAFT 2.) MISSING J-BOX COVERS NE ELEV. SHAFT LEVEL 3. WEATHER PROOF AROUND OUTLETS LEVEL 1 & 2 @ NE ELEV. 4.) BOTTOM RAIL OF GUARD EXCEEDS 4" MAX CLEARANCE FROM DECK. PREDOMINANTLY @ 3RD LEVEL BY NW ELEV BUT ALL LEVELS AT BOTH ELEV. SHOULD BE CHECKED ALSO STAIRS @ OTHER SIDE OF DECK. 5.) HC. PARKING SIGNS MUST BE IN PLACE. 6.) ACCESS PANELS IN LIGHT POLE BASES MUT BE COVERED.
07/09/2002 BUILDING - FINAL Partial Approval
09/28/2001 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*PHASE 1 STRUCTURAL OK 1.) YOU MAY NOT HANG SIGN FROM ELECTRIC CONDUIT, WATER PIPES,STAND PIPES ORDAIN PIPES. FASTEN SIGNS WITH HANGERS TO UNDERSIDE OF DECKS. 2.) I STILL NEED ELECTRIC APPROVAL & ELEVATOR CERTIFICATION.
09/25/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*COMPLETE SIGNAGE FOR GVW. GET INSPECTION FOR EMER POWER COMPLETE STUCCO ON ELEVATOR & GET ELEVATOR CERTIFICATOR. 1005.1010,1015,1035 FIRST PHASE OK.
09/18/2001 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*
08/21/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*STOP WORK ORDER LIFTED PER DAV MANN. APPROVED PLANS MUT BE KEPT ON SITE. WE WILL NEED TO SEE THAT PRE-LAST BEAMS HAVE BEEN UL APPROVED PER RESIGN NOS. N 203.
08/16/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*
07/24/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*1.) BOLT STAIR STRINGERS TO SLAB @ 1ST FLOOR (COMPLETE THE STAIRS) 2.) REDUCE SPACE BETWEEN STRINGER AND GUARD RAIL TO LESS THAN 4 3.) COMPLETE FLATWORK 4.) COMPLETE GUARD RAILS, LESS THAN 4" SPACES X 42" HIGH MIN 5.) COMPLETE STRIPS H.C. SIGN FRAME 6.) PROVIDE APPROVED PLBG & ELEC. FINALS.