Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T00CM01081
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection 0000* | |
02/26/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*RAMP STEM WALL AT K.6. YOU NEED TO TIE OFF BAR SO IT HAS 2" CLEARANCE FROM SIDESOF FORMS. TOP OF BARS TO BE 2" FROM TOP OF WALL NOT MORE. | |
02/21/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*GH/1-8;/HJ8-15 | |
02/19/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*RAMP FOOTERS OK. | |
02/15/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
02/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*RAMP FOOTERS NOT COMPLETE. | |
02/07/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
02/06/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*MASONRY PREGROUT @ MECH ROOM. | |
02/04/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*IL MASONRY ENCLOSURES | |
01/31/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PREFAB PLACEMENT COMPLETE STILL NEW WELD @ SHEAR WALL INSPECTION | |
01/30/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PARTIAL LEVEL 3/2 G/5-H. | |
01/28/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PREFAB PLACEMENT NEAR COMPLETE | |
01/18/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*I NEED SPECIAL INSP REPORT FOR DECK TOPPING I HAVE SOME QUESTION. | |
01/17/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PROGRESS ON PRE-CAST CORD REBAR AROUND PERIMETER.MESH PROGRESS FOR PRESLAB. BEGINNING FILL @ 1ST LEVEL. | |
01/11/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PLACEMENTS UG1/-15. A.) 2ND & 3RD LEVEL DECK WELDS (VISUAL INSPECT) B.) SHEAR WALLS NOT YET DONE C.) INITAIL PLACEMENT OF STAIRS. D.) BOLLARD PLACEMENT LEVEL 2 NW STAIR. | |
01/04/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*CONTINUING PLACEMENT OF GARAGE PARTS & FOOTER FOR RAE CANOPY. | |
12/20/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) VISUAL WELD SW7,SW15,SW14 OK. 2.) COLUMN & DECK PLACEMENTS HF/1-8 3.) COLUM & DECK PLACEMENTS HL/1-4. | |
12/12/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) VISUAL WELD INSP DONE ON SW4,SW13 ALL LEVELS. 2.) PROGRESS ON PREFAB PLACEMENT AND WELDS JF/1-5 3.) GROUT UNDERNEATH AND COLUMN PLACEMENT KF/1-4 AND #F/4S | |
12/11/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PROGRESS ON PRELAB & APPROVAL AT BOLT REPAIR OK. | |
12/06/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SOUTH GARAGE PLEASE PROVIDE COPY OF RFI FOR REPAIR OF BENT CAISSON BOLTS. | |
12/05/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PROGRESS ON PREFAB GARAGE COLUMNS @ F7 AND F10 CAST LONG FOR ELEVATION OF GRADE BEAM, REPAIR BEING WORKED ON. | |
11/30/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SW20;SW21. | |
11/29/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SW7,SW8,SW9,STAIR 8. 1.) MAKE SURE EMBED LENGTH OF WELD PLATES ON SW 8 & SW 7 AR WITHIN TOLERANCES.( I WILL ACCEPT REPORT FROM RICK NOWAK) 2.) I WANT INFORMATION ON HOW YOU PLAN TO REPAIR CAISSON BOLTS @ K13 AND K1. | |
11/28/2001 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*NOT READY I NEED SPECIAL INSPECTION REPORTS BEFORE I APPROVE PLACEMENT OF CONCRETE. | |
11/26/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PROGRESSING ON SHEAR WAL GRADE BEAMS. | |
11/21/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*K.6 LINE SW - 5 G6A (X-TRA CASSION FOR RFI REPAIR. | |
11/20/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*GRADE BEAM 5-6 BEAM 5-5 BEING LIFTED 1" TO CONFORM TO TOLERANCE ON EMBED PLATES CARSSONS L-LINE IN PROGRESS. | |
11/19/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*CAISSONS:K-9-13;L 2/3 & L 8/9 OK GRADE BEAM; SWS;SW13 OK CAISSON K.2-14, J.8-14 OK. | |
11/16/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*F2,F3-4 GRAVE BEAMS OK DC4 S ON G ,H & J LINE ELEVATOR PITS STEMS WALLS (RECHECK DOWELLS ) G-6 CAISSEN 12" OFF CENTER RFI PROVIDED FOR 2ND CAISSON AND GRADE BEAM. | |
11/09/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*CAISSONS DCS Q2, G2: GRADE BEAM F-3/4 1.) PLEASE PROVIDE APPROVED INSPECTION REPORT FROM H B W ON GRADE BEAMS. | |
11/08/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) F-LINE DC-6 CAISSON'S POURED BEFORE INSPECTION 2.) DC4 @ 11,10, 8 & 6 OK | |
09/25/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
02/15/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* FOOTING | |
01/26/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | FOOTINGS AT COL. LINE A& 1.5 | |
12/28/2000 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* (AISONS AT LINE E.5 (SHEAR WALL LOCATION) |
|
12/20/2000 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* "E" LINE PLEASE CONSIDER PLACING THE WHEELS (SPACERS) SO THAT THEY WILL ROLL DOWN THE SIDES OF THE BORING |
|