Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T00CM01081


Addresses:

7275 S TUCSON BL


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T00CM01081

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
03/13/2002 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection 0000*
02/26/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*RAMP STEM WALL AT K.6. YOU NEED TO TIE OFF BAR SO IT HAS 2" CLEARANCE FROM SIDESOF FORMS. TOP OF BARS TO BE 2" FROM TOP OF WALL NOT MORE.
02/21/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*GH/1-8;/HJ8-15
02/19/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*RAMP FOOTERS OK.
02/15/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/13/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*RAMP FOOTERS NOT COMPLETE.
02/07/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/06/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*MASONRY PREGROUT @ MECH ROOM.
02/04/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*IL MASONRY ENCLOSURES
01/31/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PREFAB PLACEMENT COMPLETE STILL NEW WELD @ SHEAR WALL INSPECTION
01/30/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PARTIAL LEVEL 3/2 G/5-H.
01/28/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PREFAB PLACEMENT NEAR COMPLETE
01/18/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*I NEED SPECIAL INSP REPORT FOR DECK TOPPING I HAVE SOME QUESTION.
01/17/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PROGRESS ON PRE-CAST CORD REBAR AROUND PERIMETER.MESH PROGRESS FOR PRESLAB. BEGINNING FILL @ 1ST LEVEL.
01/11/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PLACEMENTS UG1/-15. A.) 2ND & 3RD LEVEL DECK WELDS (VISUAL INSPECT) B.) SHEAR WALLS NOT YET DONE C.) INITAIL PLACEMENT OF STAIRS. D.) BOLLARD PLACEMENT LEVEL 2 NW STAIR.
01/04/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*CONTINUING PLACEMENT OF GARAGE PARTS & FOOTER FOR RAE CANOPY.
12/20/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) VISUAL WELD SW7,SW15,SW14 OK. 2.) COLUMN & DECK PLACEMENTS HF/1-8 3.) COLUM & DECK PLACEMENTS HL/1-4.
12/12/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) VISUAL WELD INSP DONE ON SW4,SW13 ALL LEVELS. 2.) PROGRESS ON PREFAB PLACEMENT AND WELDS JF/1-5 3.) GROUT UNDERNEATH AND COLUMN PLACEMENT KF/1-4 AND #F/4S
12/11/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PROGRESS ON PRELAB & APPROVAL AT BOLT REPAIR OK.
12/06/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*SOUTH GARAGE PLEASE PROVIDE COPY OF RFI FOR REPAIR OF BENT CAISSON BOLTS.
12/05/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PROGRESS ON PREFAB GARAGE COLUMNS @ F7 AND F10 CAST LONG FOR ELEVATION OF GRADE BEAM, REPAIR BEING WORKED ON.
11/30/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*SW20;SW21.
11/29/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*SW7,SW8,SW9,STAIR 8. 1.) MAKE SURE EMBED LENGTH OF WELD PLATES ON SW 8 & SW 7 AR WITHIN TOLERANCES.( I WILL ACCEPT REPORT FROM RICK NOWAK) 2.) I WANT INFORMATION ON HOW YOU PLAN TO REPAIR CAISSON BOLTS @ K13 AND K1.
11/28/2001 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection 0000*NOT READY I NEED SPECIAL INSPECTION REPORTS BEFORE I APPROVE PLACEMENT OF CONCRETE.
11/26/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PROGRESSING ON SHEAR WAL GRADE BEAMS.
11/21/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*K.6 LINE SW - 5 G6A (X-TRA CASSION FOR RFI REPAIR.
11/20/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*GRADE BEAM 5-6 BEAM 5-5 BEING LIFTED 1" TO CONFORM TO TOLERANCE ON EMBED PLATES CARSSONS L-LINE IN PROGRESS.
11/19/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*CAISSONS:K-9-13;L 2/3 & L 8/9 OK GRADE BEAM; SWS;SW13 OK CAISSON K.2-14, J.8-14 OK.
11/16/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*F2,F3-4 GRAVE BEAMS OK DC4 S ON G ,H & J LINE ELEVATOR PITS STEMS WALLS (RECHECK DOWELLS ) G-6 CAISSEN 12" OFF CENTER RFI PROVIDED FOR 2ND CAISSON AND GRADE BEAM.
11/09/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*CAISSONS DCS Q2, G2: GRADE BEAM F-3/4 1.) PLEASE PROVIDE APPROVED INSPECTION REPORT FROM H B W ON GRADE BEAMS.
11/08/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*1.) F-LINE DC-6 CAISSON'S POURED BEFORE INSPECTION 2.) DC4 @ 11,10, 8 & 6 OK
09/25/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
02/15/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000* FOOTING
01/26/2001 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTINGS AT COL. LINE A& 1.5
12/28/2000 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
(AISONS AT LINE E.5 (SHEAR WALL LOCATION)
12/20/2000 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
"E" LINE
PLEASE CONSIDER PLACING THE WHEELS (SPACERS) SO THAT THEY WILL ROLL DOWN THE SIDES OF THE BORING
12/19/2000 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*
D-LINE