Inspection Status: Partial Approval
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 03/06/2001 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000* |
| 03/06/2001 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 07/31/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000*/JEFF, I WILL PICK UP COMPACTION REPORT AT THE PRE SLAB. CHECK UFFER TO SEE IF ITS GOING TO BE LONG ENOUGH TO HIT THE PANEL? |
| 07/28/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000*/1. CONTRACTOR NEED TO PROVIDE A SOILS REPORT APROVED TO BUILD ON FILL, (COMPACTION TESTING RESULTS PER ENGINEER.) 2. NO ELECTRIC UFFER INSTALLED AT THIS TIME CONTRACTOR WILL NEED TO PROVIDE GROUND RODS IF HE CONTINUES. 3. PENDING REVISIONS FOR REAR PORCH EXTENSION. 4. CONTRACTOR CONTINUE AT OWN RISK PENDING ABOVE INFORMATION. REBAR PLACEMENT FOR PARIMETER POOTINGS AND EXTERIOR POST OK |