Inspection Status: Partial Approval
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/PREVIOUS ITEMS NOT COMPLETE. |
| 01/05/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/1. BLOCK AROUND MECHANICAL KNOCKOUTS 3 SIDES MIN. 2. SEE HEADER SCHEDULE FOR KING STUD INSTALLATION NOT BUILT AS PER PLAN. 3. REPLACE DRAFT STOPS MISSING/REMOVED AT LONGEST CEILING HEIGHT. 4. PROVIDE POSITIVE CONNECTION AT ALL POST TO BEAM LOCATIONS. 5. PROVIDE 50 PSI FOR WATER LINES. 6. PATIO LEDGER MISSING A35'S AS PER PLAN. |
| 12/04/2000 |
FRAMING |
|
Denied |
IVRS - Inspection 0999* |