Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T00CM00182
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/08/2002 | ENGINEERING - FINAL | Approved | ||
11/29/2001 | ENGINEERING - FINAL | Partial Approval | AS NOTED PREVIOUSLY | |
10/30/2001 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O GRANTED ON 9/7/01, A FULL DRAINAGE AND ENGINEERING INSPECTION TO BE SCHEDULED AT A LATER DATE ONCE ALL ITEMS HAVE BEEN COMPLETED. | |
10/30/2001 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED AT THIS TIME. ADDITIONAL DRAINAGE ITEMS WILL BE CHANGED ONCE THE DRAINAGE REVISIONS ARE ACCEPTED. RE-INSPECTION OF THIS SITE WILL BE SCHEDULED AT A LATER DATE |