Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2000 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - 3 C.O. IN EAST BATHROOM. CHECK AT INTERMEDIATE INSPECTION INTERIOR LAUNDRY WALL. |