Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2000 |
ROOF NAILING |
|
Approved |
IVRS - Inspection 0000*/1. PLEASE KEEP ALL THE REVISED ENGINEERING AND SPCIAL INSPECTION REPORT FOR FINAL INSPECTION. THEY WILL GO TO RECORD ALONG WITH FINAL. 2. YOU WILL NEED A ELECTRIC INTERMEDIATE INSPECTION. IT HAS BEEN ADDED TO THE PERMIT. CURRENTLY SUPPLY NOT INSTALLED AND METAL BOXES NOT GROUNDED. GROUND NOT TIED AND CRIMPED. |
| 10/13/2000 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/1. REFER TO D1/6 ENGINEERING CALC'S YOUR ARE MISSING SIMPSON HPAD22 PER ENGINEER REQUIREMENTS. 2. D2/6 REQUIRES 1/2 PLY WITH 10D AT 6" O.C. 3. D 5/6 SIMPSON PATM'S AT 48" O.C. NOT INSTALLED. 4. COMPLETE LEDGER BOLTING. 5. HOW IS BEAM SADDLE AT N/W BEAM CONNECTION, CONNECTED TO MASONRY? |