Permit: T00BU00949

Parcel: 121100270


Addresses:

4868 E EDISON ST

Inspection Status: Partial Approval

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
12/02/2002 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*/ 1) NEED PLUMBING FINAL FOR BUILDING IE. PAN UNDER HOT WATER HEATER
07/10/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NO ONE HOME
06/12/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NO ONE HOME
06/04/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*
05/21/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NO ONE HOME
05/07/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NO ONE HOME
01/09/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NOT READY, NO ANSWER AT FRONT GATE
12/26/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NEED 1 HOUR WALL PROBLEM RESOLVED AND SOLUTION PUT ON PLAN 2) FINISH ALL OTHER ITEMS ABOVE 3) FIND GAS PIPE ENTRANCE TO HOUSE 4) 50 CU PER 1,000 BTU. INPUT
12/12/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000$
11/13/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NO ONE HOME
10/12/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) MOVE WATER HEATER
09/25/2001 BUILDING - FINAL Not ready for Inspection 1)OUTLET ON WEST WALL, OPEN GRD, ALSO WIRE WITHOUT A SHEATH OR CONDUIT 2) GALV H20 LINES & GAS LINES UNDER SLAB 3) SEWER VENT JUST BELOW THE COOLER INTAKE, EXTEND 1' ABOVE 4) BOTTOM PLATES NEED BOLTED TOO SLAB 5) OVERHANGS 3' 7" FROM EACH OTHER, BLDG LINES ARE 4' 10" FROM EACH OTHER 6)WATER HEATER T & P TERMINATION IS INSIDE THE KITCHEN 7) OPEN GROUND ON S WALL 8) NEED CROSS SECTION OF WEST WALL, ALSO NEED PROPERTY PINS ESTABLISHED 9) 1 HR CONST REQ'D WEST WALL 10) WIRING AT REAR PORCH NOT SECURED
05/10/2001 BUILDING - FINAL Denied 1) BUILDING CLOSER THAN 3' REQUIRES A MINIMUM 1 HR WALL, NOT NOTED ON PLAN 2) PERMIT TAKEN OUT FOR BUILDING, ELECTRIC, PLUMBING AND MECHANICAL NO PLAN OTHER THAN A SITE PLAN