Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Requested

Inspection History: Reconnect Only: Electrical Clearance

Permit Number - SP-NRP-1124-00164

Inspection Description - Reconnect Only: Electrical Clearance

Inspection Status - Requested

Date Description Inspector Results Comments
Reconnect Only: Electrical Clearance Requested
12/03/2024 Reconnect Only: Electrical Clearance Re-inspection required
12/09/2024 Reconnect Only: Electrical Clearance Not Ready Posted stop work order due to new wiring and plumbing being done to the unit. Provide set of drawings and letters stating that they meet or exceed the 2018 irc codes. 12/9/2024