Inspection History Details
Inspection Status: Passed
Inspection History: Reconnect Only: Electrical Clearance
Permit Number - SP-NRP-0525-00285
Inspection Description - Reconnect Only: Electrical Clearance
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2025 | Reconnect Only: Electrical Clearance | Passed | Approved for electrical reconnection of MH pedestal - RECN Clearance to TEP is required for unit #10 |