Inspection History Details
Inspection Status: Re-inspection required
Inspection History: Reconnect Only: Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | Reconnect Only: Electrical Clearance | Re-inspection required | 4-8-26: subpanel breakers are labeled over masking tape, please relabel either with a permanent black marker or provide a panel schedule with a sleeve. Also, I could not identify the unit's main panel because all metallic labeling has been painted over the years and unit numbers are completely faded. Therefore, locate correct meter and replace existing label with a new metallic label. | |
| 04/22/2026 | Reconnect Only: Electrical Clearance | Re-inspection required (with fee) | 4-22-26: per previous notes- metallic address label is unreadable and a replacement is required. | |
| 06/05/2026 | Reconnect Only: Electrical Clearance | Canceled | ||
| 07/17/2026 | Reconnect Only: Electrical Clearance | Passed | 07/17/2026 Clearance TEP RECN. Meter number: 159517291 |