Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - ENGR - Site - Assurance Release
Plan Number - S21-034
Inspection Description - COT - ENGR - Site - Assurance Release
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2024 | COT - ENGR - Site - Assurance Release | Passed | 44 % RELEASE APPROVED LOTS 45-74 | |
02/13/2023 | COT - ENGR - Site - Assurance Release | Re-inspection required | Common Area C-1 (The drainage channel on the west side only) | |
02/17/2023 | COT - ENGR - Site - Assurance Release | Not Ready | complete all the work is shown on the approved plans for all the rock wrap filter fabric within the channel on the west side of the property. Provide a certification letter from the engineer of record for all work done within the channels and all drainage pipes into the channel from the central detention retention basin none of this work has been inspected by this department or was called in for an inspection. Releasing of this common area will only be done after we have received the certification letter from the engineer of record and all documentation in regards to the drainage pipes that are currently underground that have not been inspected. | |
05/02/2024 | COT - ENGR - Site - Assurance Release | Passed | Lot 20 verbally released on 5/6/24 after site inspection by ENG team. Other lots within request still under construction. | |
05/17/2023 | COT - ENGR - Site - Assurance Release | Partial Pass | Common Area C-1 Contractor needs to finish per plan before getting a final | |
05/18/2023 | COT - ENGR - Site - Assurance Release | Basin - Fair | Common Area C-1 Needs to be completed per plan | |
07/10/2023 | COT - ENGR - Site - Assurance Release | Passed | OK to release the following Lots 24, 25, 26, 27, 28 | |
07/16/2024 | COT - ENGR - Site - Assurance Release | Passed | ||
07/27/2023 | COT - ENGR - Site - Assurance Release | Partial Pass | Common Area C-1 (See letter in files) partial pass at this time till the letters can be reviewed from the engineer of record tomorrow | |
08/01/2024 | COT - ENGR - Site - Assurance Release | Passed | ||
08/21/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot 29, 30. Ok for assurance release | |
09/05/2023 | COT - ENGR - Site - Assurance Release | Not Ready | Lot 31-35, 79-80 | |
09/12/2023 | COT - ENGR - Site - Assurance Release | Partial Pass | Channel C-1 Release - Partial Pass Final pass for this work is Pending the Verification Letter of Certification from the Engineer of Record for all work of the Norther most portion of this Channel that was not requested to be Inspected during the required work of the site. Once this letter has been received a Final Inspection can be completed for the following items noted during this Inspection today: 1) There are areas of erosion that have been noted from the past rains, these areas will need to be Inspected after they have been repaired. 2) At various locations throughout this northern section of the Channel Mirafi Filter Fabric is exposed and needs to be either repaired in place and rip rap material replaced. This may have been caused by the improper installation of the Mirafi Filter Fabric as recommended by the Manufacturer Recommendations/Cut Sheets that should have been provided by the Manufacturer with the material purchase. This will be items of Verifications that the Certification Letter needs to address. 3) Portions of the Safety Barrier has been damaged and will need to be repaired. if these damages have been caused by the on- going adjacent work, then the repair work can be attached to that Permit to be Inspected prior to their Final Approval of their work. |
|
09/12/2023 | COT - ENGR - Site - Assurance Release | Passed | Ok to Release of lots 31-35, 78-79. | |
10/12/2023 | COT - ENGR - Site - Assurance Release | Passed | Lots 81 & 82 Release Request Approved | |
10/23/2024 | COT - ENGR - Site - Assurance Release | Passed | Partial release approved on asked for lots of 136 to 143 at 73% | |
11/08/2023 | COT - ENGR - Site - Assurance Release | Passed | ||
12/05/2023 | COT - ENGR - Site - Assurance Release | Passed | Ok to Release Lots 38-44, 75-78, 87-89, 92-93. 25% Released |