Inspection Status: Passed
Inspection History: COT - ENGR - Site - Assurance Release
Plan Number - S21-019
Inspection Description - COT - ENGR - Site - Assurance Release
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2023 | COT - ENGR - Site - Assurance Release | Passed | ||
01/04/2024 | COT - ENGR - Site - Assurance Release | Partial Pass | The following common areas have been approved at this time: “A-1”, “B-1”, “B-2”, “B-3”, “C-1”, “C-2”, “C-3”, “C-4”, “C-5”, “C-6”, “C-7”, “C-8”, “D-1”. Common Area “A-2” still has some minor work that needs to be completed within its boundaries(stockpile removal) before it can be Approved. | |
01/19/2024 | COT - ENGR - Site - Assurance Release | Passed | ||
01/24/2024 | COT - ENGR - Site - Assurance Release | Partial Pass | There’s a pile of dirt on the corner of Wingate and Linder Brook north west side that needs to be removed. I spoke to Jake Wallace this morning and informed him of it. | |
02/07/2024 | COT - ENGR - Site - Assurance Release | Partial Pass | ||
02/15/2024 | COT - ENGR - Site - Assurance Release | Passed | All remaining inspections are for lot specific items for sidewalks and driveways, and will be performed at the time of the final inspection for the home itself | |
03/07/2023 | COT - ENGR - Site - Assurance Release | Passed | Partial Lot Release, Lots: 4, 6, and 87 Lots 4 & 87 have non compliant driveway slope exceeding 15%. KB responsible for solution. |
|
03/28/2023 | COT - ENGR - Site - Assurance Release | Passed | OK to release Lot 92 Release | |
05/04/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot release for lots: 8, 88, 89 90 | |
05/11/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot 59 OK TO release/There’s a hydraulic spill on Pantano Bluff from 9061 through 9013 addresses | |
05/23/2023 | COT - ENGR - Site - Assurance Release | Not Ready | 1, 3, 5, 7, 38, 46 and 47. The grading for all these lots are not completed yet contractor Well resubmit | |
06/06/2023 | COT - ENGR - Site - Assurance Release | Passed | 1, 3, 5, 7, 38, 46 and 47.ok to release | |
06/13/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot 2, 93 GOOD FOR ASSURANCE RELEASE | |
06/28/2023 | COT - ENGR - Site - Assurance Release | Not Ready | 58, 77, 91, 94, 95 and 96 There’s no driveways sidewalks, and the drainage is not completed | |
07/11/2023 | COT - ENGR - Site - Assurance Release | Passed | Ok for release of Lot 27 and 76 | |
07/31/2023 | COT - ENGR - Site - Assurance Release | Passed | The following Lots are ok to be released 37, 78, 79, 85, 97, 98, 99 and 100 | |
08/23/2023 | COT - ENGR - Site - Assurance Release | Passed | 25, 26, 33, 34, 81, 84, 101, 103, 104 and 105 ok to release | |
08/28/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot 74 ok to release | |
09/19/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot Release Inspection for Lots: 28, 29, 30, 32, 44, 46, 56, 57, 60, 102. / lots 44 didn’t pass there is no sidewalk and no driveway.lot 102 landscaping is not completed.dirt pile and garbage /from now on you can only call in for two to three lots at a time to be released. | |
09/26/2023 | COT - ENGR - Site - Assurance Release | Passed | Lot 36 OK four release | |
10/23/2023 | COT - ENGR - Site - Assurance Release | Passed | Ok to Release Lots 41, & 86 | |
11/06/2023 | COT - ENGR - Site - Assurance Release | Passed | Partial Release Lots:10, 24, 43, 45, 62, 63, 64, 65, 66, 75, 82, 83 - 61% Released | |
12/04/2023 | COT - ENGR - Site - Assurance Release | Passed | Lots 39 & 40 - 63% released | |
12/19/2023 | COT - ENGR - Site - Assurance Release | Passed |