Case: S20-025

Parcel: 141434630

Inspection Status: Passed

Inspection History: COT - ENGR - Site - Assurance Release

Plan Number - S20-025

Inspection Description - COT - ENGR - Site - Assurance Release

Inspection Status - Passed

Date Description Inspector Results Comments
02/14/2023 COT - ENGR - Site - Assurance Release Passed First Release Lots 2, 3, 38-47 Ok to release
03/15/2024 COT - ENGR - Site - Assurance Release Passed Ok to Release Lots 16-28, 84-86.

None of the sidewalks have been completed for any of the approved lots to be released at this time. All sidewalks and driveways will have to be inspected during the inspection for the home itself.
05/11/2023 COT - ENGR - Site - Assurance Release Not Ready Lot 31-37, 48-55, 69-72 Lot need to have sidewalk and driveway
05/16/2023 COT - ENGR - Site - Assurance Release Passed OK TO RELEASE THE FOLLOWING Lot 31-37, 48-55, 69-72. THE SIDEWALKS AND DRIVEWAYS NOTED IN THE PREVIOUS INSPECTION ARE THE RESPONSIBILITY OF THE CITY OF TUCSON TRANSPORTATION DEPARTMENT TO VERIFY COMPLETENESS AND THAT THERE IS NO DAMAGE.
07/18/2023 COT - ENGR - Site - Assurance Release Passed Ok to release the following Lots 62-68, 73-79 inclusive
08/14/2024 COT - ENGR - Site - Assurance Release Passed
10/23/2023 COT - ENGR - Site - Assurance Release Passed Ok to Release Lots: 29, 30, 56-61, 80-83.