Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | no punch list has been generated,please schedule for a walk thru with PIA Inspector | |
| 09/18/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | Punchlist items not completed | |
| 10/25/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | Contact is Kevin Tarbox – 520.247.0297 punchlist not completed |
|
| TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Canceled |