Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
Plan Number - S20-022
Inspection Description - TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/30/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | no punch list has been generated,please schedule for a walk thru with PIA Inspector | |
09/18/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | Punchlist items not completed | |
10/25/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | Contact is Kevin Tarbox – 520.247.0297 punchlist not completed |
|
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Canceled |