Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan: S18-090

Parcel: 11106157A

Inspection Status: Re-inspection required

Inspection History: COT - ENGR - Site - Assurance Release

Date Description Inspector Results Comments
03/11/2022 COT - ENGR - Site - Assurance Release BBENEDON Denied Entered by NGARCIA3 - denied. Corrections required. Contractor shall make all corrections noted on March 17 of 2021 and schedule inspections from development package permit DP 18-0183 as previously requested. accessible walkways are out of compliance.
03/17/2021 COT - ENGR - Site - Assurance Release BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Lots 10 through 22
03/16/2021 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT5 - OK TO RELASE THE FOLLOWING LOTS 10-22 AT THIS TIME, ALL ADDITIONAL LOTS WILL REQUIRE ADDITIONAL INSPECTIONS OF THE SITE PRIOR TO RELEASE, AND REQUIRED LETTERS.
05/01/2025 COT - ENGR - Site - Assurance Release Passed Lots 5-9 are developed. All amenities are in place. Assurance release pass.
06/11/2025 COT - ENGR - Site - Assurance Release Passed
06/17/2025 COT - ENGR - Site - Assurance Release Passed