Inspection History Details
Inspection Status: Approved
Inspection History: ASSURANCE - DSD
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2021 | ASSURANCE - DSD | Approved | ALL LOTS, BLOCKS, AND COMMON AREAS HAVE BEEN APPROVED FOR RELEASE AT THIS TIME, DUE TO THE APPROVAL OF THE REVISED DRAWINGS ON 11/29/2021. | |
| 09/24/2021 | ASSURANCE - DSD | Denied | IS DENIED AS PREVIOUSLY NOTED FOR ALL COMMON AREAS ON THIS SITE. PROVIDE REVISED DRAWINGS FOR THIS SITE FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THE ORIGINAL APPROVED PLANS. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING: 1) PROVIDE APPROVED REVISED DRAWINGS SHOWING ALL CHANGES TO THE LAYOUT OF ON SITE SIDEWALKS AND PEDESTRIAN PATHWAYS INOT EACH OF THE AFFECTED UNITS. 2) PROVIDE APPROVED DRAWINGS FOR THE CHANGES THAT HAVE BEEN MADE TO THE COMMON AREAS LOCATED WITHIN THIS SITE. THESE DRAWINGS WILL NEED TO REFLECT THE BASIN/DRAINAGE WAY AND THE ELEVATED PADS LOCATED IN THE SOUTHEAST PORTION OF THIS SITE, WHICH WILL REFLECT ALL CHANGES INCLUDING THE ADDITIONAL GRASS AND CONCRETE PADS. 3) PROVIDE ALL DOCUMENTATION THAT IS NEEDED THAT ALLOWED THE DEVELOPER/CONTRACTOR THE AUTHORITY TO BUILD WITHIN THE NO BUILD AREAS THROUGHOUT THIS SITE. THIS MATERIAL WILL NEED TO BE REVIEWED AND APPROVED BY ALL NECESSARY PARTIES BEFORE THIS SITE CAN BE COMPLETED AND APPROVED IN ITS CURRENT CONDITION. IF THERE ARE ANY QUESTIONS PLEASE FEEL FREE TO CONTACT ME AT David.Roberts@tucsonaz.gov or by Phone at (520) 349-7643. |
|
| 08/25/2021 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE LOT 17 | |
| 08/13/2021 | ASSURANCE - DSD | Partial Approval | 10800 (ASSURANCE - DSD) IS PARTIAL, OK TO RELEASE THE FOLLOWING LOTS 1,2 9,21,29,34,35,38,40,42,43,44,45,46,47,48 and 50,51,52,53,54, BUT NONE OF THE COMMON AREAS TILL ALL PREVIOUSLY NOTED ISSUES HAVE BEEN ADDRESSED AND CORRECTED. | |
| 08/13/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL, OK TO RELEASE THE FOLLOWING LOTS 1,2 9,21,29,34,35,38,40,42,43,44,45,46,47,48 and 50,51,52,53,54, BUT NONE OF THE COMMON AREAS TILL ALL PREVIOUSLY NOTED ISSUES HAVE BEEN ADDRESSED AND CORRECTED. | |
| 06/25/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK FOR THE RELEASE OF LOT #29 BUT NOT FOR A FULL RELEASE. | |
| 06/25/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK FOR THE RELEASE OF LOT #49 BUT NOT FOR A FULL RELEASE. | |
| 06/23/2021 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE LOTS 2,48,52,53, AND 54 | |
| 06/02/2021 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE LOTS 35 42 | |
| 05/27/2021 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE LOTS 47 AND 46/ PARTIAL | |
| 03/31/2021 | ASSURANCE - DSD | Partial Approval | 450 OK TO RELEASE LOT 40 | |
| 03/12/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL, OK TO RELEASE LOT #9 AT THIS TIME. | |
| 03/03/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL OK TO RELEASE LOT 21 ONLY | |
| 02/26/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK TO RELEASE THE FOLLOWING LOT 44 ONLY | |
| 02/11/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK TO RELEASE LOT #1 | |
| 01/27/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL - ASSURANCE-DSD RELEASE LOT 51 | |
| 01/22/2021 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK TO RELEASE THE FOLLOWING LOTS 7 and 29 | |
| 12/14/2020 | ASSURANCE - DSD | Partial Approval | PARTIAL, NO CHANGE SINCE THE PERVIOUS INSPECTION. SITE VISIT ONLY AT THIS TIME. | |
| 12/02/2020 | ASSURANCE - DSD | Partial Approval | partial approval. OK for release of lot #34. | |
| 11/23/2020 | ASSURANCE - DSD | Partial Approval | partial approval. OK for release of lot #43. | |
| 11/13/2020 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK TO RELEASE LOT #50 | |
| 09/16/2020 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, OK FOR THE RELEASE OF LOTS 38 & 45. COMMON AREA SIDEWALKS HAVE NOT BEEN POURED AT THIS TIME BUT WILL BE CHECKED FOR COMPLIANCE WHEN THEY ARE COMPLETED. | |
| 06/09/2020 | ASSURANCE - DSD | Partial Approval | ok to release lots 3,10,41 | |
| 05/07/2020 | ASSURANCE - DSD | Partial Approval | ok to release lots 4,13 | |
| 04/23/2020 | ASSURANCE - DSD | Not ready for Inspection | IS NOT READY AT THIS TIME DUE TO THE AMOUNT OF UNDEVELOPED LOTS. OKAY FOR RELEASES UPTO 75% AND INDIVIDUAL RELEASES AS NEEDED. | |
| 04/23/2020 | ASSURANCE - DSD | Partial Approval | Construct all lot specific sidewalks/driveway aprons or submit a substitute trust assurance agreement (i.e. removes that as an assurable item). | |
| 04/17/2020 | ASSURANCE - DSD | Partial Approval | Partial approval. OK to release Lot 39. | |
| 01/07/2020 | ASSURANCE - DSD | Partial Approval | ok to release lots 30,31,33,37 | |
| 10/21/2019 | ASSURANCE - DSD | Partial Approval | ok to release lots 14 and 32 | |
| 04/29/2019 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE THE FOLLOWING LOTS 11, 12, 23 THROUGH 27. ALL OTHE INSPECTIONS ARE STILL NEEDED | |
| 03/22/2019 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE LOT #16. | |
| 01/25/2019 | ASSURANCE - DSD | Partial Approval | OK FOR THE INITIAL RELEASE OF LOTS AT THIS TIME LOT#15 IS APPROVED TODAY |