Inspection Status: Approved
Inspection History: ASSURANCE - DSD
Plan Number - S17-005
Inspection Description - ASSURANCE - DSD
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2020 | ASSURANCE - DSD | Approved | OK TO RELEASE ALL LOTS, BLOCKS, AND COMMON AREAS. | |
| 06/15/2020 | ASSURANCE - DSD | Partial Approval | PARTIAL AT THIS TIME, 6 LOTS REMAIN WITHOUT SIDEWALKS AND DRIVEWAYS, 2 OF THE 6 LOTS HAVE NO CONSTRUCTION ON THEM AT THIS TIME. IF A COMPLETION BOND IS IN PLACE AT THIS TIME FOR THE SIDEWALK AND DRIVEWAYS THIS MAY BE CONSIDERED COMPLETE. | |
| 06/09/2020 | ASSURANCE - DSD | Partial Approval | SWPPP termination letter uploaded | |
| 05/01/2020 | ASSURANCE - DSD | Partial Approval | IS PARTIAL AT THIS TIME, OK FOR THE RELEASE OF LOTS 3 & 8. THERE HAS BEEN DAMAGED SIDEWALK NOTED DURING THE PAST INSPECTIONS THAT NEED TO BE REMOVED AND REPLACED PRIOR TO THE FINAL ACCEPTANCE OF THIS SUBDIVISION AND THE DEVELOPMENT PACKAGE/TENTATIVE PLAT. THE DEVELOPER NEEDS TO WALK THIS SITE AND CHECK FOR ALL DAMAGES THAT WILL NEED TO BE REPAIRED PRIOR TO THE FINAL APPROVAL. | |
| 04/23/2020 | ASSURANCE - DSD | Partial Approval | Once the Clerk records the substitute assurance agreement removing lot specific sidewalks for S17-005, we will process a full and final release of assurances, unless there are results listing incomplete infrastructure. | |
| 04/23/2020 | ASSURANCE - DSD | Approved | Construct all lot specific sidewalks or wait for recorded substitute trust assurance agreement. | |
| 03/12/2020 | ASSURANCE - DSD | Approved | OK for lot releases 4,11,and20. | |
| 02/13/2020 | ASSURANCE - DSD | Partial Approval | ok to release lots 13,15,33. Trust agent informed that release is beyond 75% and that no further lots will be released until all work is complete or a substitute agreement is recieved | |
| 11/25/2019 | ASSURANCE - DSD | Partial Approval | ok to release lot 18. | |
| 08/14/2019 | ASSURANCE - DSD | Not ready for Inspection | RELEASES CAN BE SOUGHT FOR THE COMMON AREAS, OR PLACE A COMPLETION BOND FOR ALL REMAINING ASSURABLE ITEMS. THE LOTS BELOW ARE COMPLETED IN THE FOLLOWING MANNER: 1) VACANT NOT CONSTRUCTED UPON, LOTS: 1-4, 6-8, 10-13, 15-18, 20-21, 32-33, 35-36. 2) UNDER CONSTRUCTION ON LOTS: 5, 14, 23, 26, 29, 37-38, 42, 47, 49. 3) COMPLETED ON LOTS: 9, 19, 22, 24-24272830-31, 34, 39-41, 43-46, 48, 50-55 |
|
| 07/19/2019 | ASSURANCE - DSD | Partial Approval | ok to release lots 5,9,21,23,29,38,42. Lot release total now at 74.5% | |
| 04/18/2019 | ASSURANCE - DSD | Partial Approval | ||
| 03/22/2019 | ASSURANCE - DSD | Partial Approval | OK TO RELEASE LOTS 14, 30, 31, 34, 36, 37, 45 | |
| 02/15/2019 | ASSURANCE - DSD | Partial Approval | OK FOR INITIAL RELEASE AND OK TO RELEASE LOTS 25, 26, 40, 41 |