Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: S15-049

Parcel: 11006005F


Addresses:

3103 N COLUMBUS BL


Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Plan Number - S15-049

Inspection Description - ASSURANCE - DSD

Inspection Status - Approved

Date Description Inspector Results Comments
01/11/2021 ASSURANCE - DSD Approved APPROVED - THE 6 REMAINING SIDEWALKS AND DRIVEWAYS ARE BEING COMPLETED WITH EACH OF THE HOMES THAT ARE CURRENTLY UNDER CONSTRUCTION, UNDER DP14-0148
01/07/2021 ASSURANCE - DSD Partial Approval TIHIS SITE HAS BEEN CHECKED FOR A FULL RELEASE BUT IS UNABLE TO BE DONE AT THIS TIME. THE SITE HAS 5 LOTS CURRENTLY UNDER CONSTRUCTION THAT STILL NEED TO HAVE THE SIDEWALK AND DRIVEWAYS REPLACED. ALSO THE DEVELOPMENT PACKAGE FOR THIS SITGE IS STILL OPEN AND NEEDS TO BE INSPECTED TO SEE WHAT CAN BE CLOSED OUT, THESE INSPECTIONS HAVE BEEN SET TO BE PERFORMED ON 1/11/2021.
09/11/2020 ASSURANCE - DSD Partial Approval PARTIAL AT THIS TIME, MISSING THE SIDE WALK AND DRIVEWAYS, DG AND LANDSCAPING FOR LOTS #5, #9 & 10, 12 - 16. THE SIDEWALKS WILL BE CHECKED FOR ADA COMPLIANCE OF SLOPES PRIOR TO FINAL APPROVAL
09/08/2020 ASSURANCE - DSD Partial Approval Partial approval. OK to release lots.9,10,13,14
07/24/2020 ASSURANCE - DSD Partial Approval OK TO RELEASE LOTS 8,12,15,16, SIDEWALK AND DRIVEWAYS WILL NEED TO BE CHECKED AT A LATER DATE, THEY ARE NOT INSTALLED AT THIS TIME.
03/20/2020 ASSURANCE - DSD Partial Approval Lots 1,2,3,4 and 10 completed. Lot 7 under construction. All other lots have not started. Street and curbs complete.
11/04/2019 ASSURANCE - DSD Partial Approval OK FOR THE INITIAL RELEASE OF THE LOTS. FINAL NOT TO BE GIVEN TILL ALL THE SITE HAS BEEN CONSTRUCTED UPON, OR TILL THERE IS LESS THAN ONE ACRE OF OPEN PROPERTY. LOT REQUEST TO BE SENT TO JOHN VAN WINKLE AS NEEDED.
06/21/2019 ASSURANCE - DSD Partial Approval THE SITE HAS BEEN CHECKED AND IS OK FOR THE RELEASE OF LOTS AT THIS TIME. LOT RELEASES WILL BE INSPECTED AS THEY ARE REQUESTED TO VERIFY COMPLIANCE.