Case: S15-019

Parcel: 133040170

Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Plan Number - S15-019

Inspection Description - ASSURANCE - DSD

Inspection Status - Approved

Date Description Inspector Results Comments
09/08/2017 ASSURANCE - DSD Approved REMAINING MINOR ISSUES WILL BE ATTACHED TO THE NEW DEVELOPMENT PACKAGE FOR THIS SITE PULLED BY THE DEVELOPER.
06/12/2017 ASSURANCE - DSD Continued THE COMMENTS MADE ON 6/9/2017 HAVE BEEN EMAILED ON THIS DATE TO JEFF GEREKE AND PATRICIA GEHLEN.
06/09/2017 ASSURANCE - DSD Continued SITE NOT COMPLETE, SEE THE FOLLOWING COMMENTS: CONSIDERATION FOR THE RELEASE OF THE ASSURANCES CAN BE DONE ONCE YOU MEET THE FOLLOWING REQUIREMENTS: 1) TO RELEASE THE ASSURANCE BEFORE THE SITE IS FINALIZED ALL INSPECTIONS HAVE TO BE APPROVED BY EACH OF THE DEPARTMENTS NOTING THAT THEY HAVE HAD ALL THEIR CONCERNS ADDRESSED. 2) PDSD WILL THEN BE PLACING AN INSPECTION ONTO THE COMBO PERMITS FOR ALL THE REMAINING UNDEVELOPED LOTS FOR THE ASSURABLE ITEMS THAT HAVE NOT BEEN COMPLETED AT THE THAT TIME ADJACENT TO EACH LOT. THIS INSPECTION WILL BE PERFORMED AND APPROVED BEFORE THE COMBO PERMIT IS FINALIZED AND CLOSED.
09/16/2016 ASSURANCE - DSD Continued REQUESTED RELEASE FOR LOTS 3, 22, 26, 43, 44, 50, ALL ARE ABLE TO BE RELEASED AT THIS TIME.
07/14/2016 ASSURANCE - DSD Partial Approval LOOKED AT THE SITE TO SEE IF IT IS READY FOR THE INITIAL RELEASE OF THE LOTS. THE UTILITIES HAVE BEEN CONSTRUCTED UPTO THE PROPERTY LINE, THE DRAINAGE WAYS HAVE BEEN ROUGHED IN AT THIS TIME, THE ROADWAY HAS BEEN CONSTRUCTED THROUGHOUT THE SITE.