Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - ENGR - Site - Assurance Release
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2016 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 11/07/2016 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - MIKE CALLED ME AND ADVISED THAT THE SLOPES ON THE PUBLIC SIDEWALKS AND WHEELCHAIR ACCESS RAMPS ARE LESS THAN 2%, SO LOT #2 CAN BE RELEASED AT THIS TIME. |
| 11/04/2016 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Correction Required |
Entered by DROBERT5 - LOOKED OVER THE AREA TO SEE IF THE SITE IS READY FOR THE INITIAL RELEASE OF LOTS. IT APPEARS THAT THE SITE HAS NO COMMON AREAS THAT AFFECT THE RELEASE OF LOT NUMBER 4062 E GLENN STREET. I HAVE ASKED MIIKE WITH THE TRANSPORTATION DEPARTMENT TO CHECK THE SLOPE GRADES ON THE SIDEWALK AND WHEELCHAIR ACCESS RAMP TO VERIFY THAT THE SLOPES ARE GOOD. |