Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ASSURANCE - PC WASTEWATER
Plan Number - S11-050
Inspection Description - ASSURANCE - PC WASTEWATER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2018 | ASSURANCE - PC WASTEWATER | Approved | From: Lorenzo Hernandez (RWRD) Sent: Friday, November 9, 2018 2:40 PMTo: 'john.vanwinkle@tucsonaz.gov' <john.vanwinkle@tucsonaz.gov>Cc: Sylvia Quinlan <Sylvia.Quinlan@pima.gov>; 'subdivisionlotrelease@tucsonaz.gov' <subdivisionlotrelease@tucsonaz.gov>; 'Clayton Trevillyan' <Clayton.Trevillyan@tucsonaz.gov>Subject: Sorrento Square Assurances John The attached Final Plat for the re-subdivision of Sorrento Square Retail Center, dated Dec. of 2017, was signed by the City Engineer, Fred Felix, and provides the Assurance that “……all improvements, such as streets, sidewalks, sewers….have been completed…..”. Additionally, the attached Final Acceptance letter from RWRD signifies that the Public Sewer (Plan No. G-2010-073) installed by the Developer for Sorrento Square Retail Center, which includes Block 1 of the re-subdivided Final Plat, has been inspected, is in compliance with RWRD Standards and has been accepted into our infrastructure for continuous maintenance. I’m hopeful that this correspondence will provide the COT the documentation needed for the assurance release. Let me know if you have any questions. Lorenzo Lorenzo Hernandez, P.E. Civil Engineering Manager Technical Services and Engineering, Field Engineering Division Pima County Regional Wastewater Reclamation Department 1313 South Mission Road, Building 17 Tucson, Arizona 85713 Phone: 520-724-6645 lorenzo.hernandez@pima.gov |
|
12/05/2011 | ASSURANCE - PC WASTEWATER | Partial Approval | THIS INSPECTION IS BEING POSTED AFTER RECEIVING A LETTER FROM PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT ACKNOWLEDGING THAT THE PHASE I PORTION OF THIS SITE HAS BEEN APPROVED AT THIS TIME AND IS ACCEPTED FOR MAITENANCE. |