Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Plan Number - S09-018
Inspection Description - TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2011 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | DROBERTS | Approved | Entered by DROBERT5 - PER CONVERSATION WITH JOSE ORTIZ THIS SITE CAN BE APPROVED FOR A FULL RELEASE. THIS PLAT IS THE SAME AS S04-182 THAT WAS APPROVED AND RELEASED PREVIOUSLY ON 2/17/2009. THE FILING OF THIS NEW PLAT APPEARS TO BE IN ERROR SINCE IT IS THE SAME AS THE ORIGINAL PLAT FILED UNDER S04-182. |
09/22/2011 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | DROBERTS | Approved | Entered by DROBERT5 - PER CONVERSATION WITH RICHARD LEIGH THIS SITE CAN BE APPROVED FOR A FULL RELEASE. THIS PLAT IS THE SAME AS S04-182 THAT WAS APPROVED AND RELEASED PREVIOUSLY ON 2/17/2009. THE FILING OF THIS NEW PLAT APPEARS TO BE IN ERROR SINCE IT IS THE SAME AS THE ORIGINAL PLAT FILED UNDER S04-182. |