Plan: S08-021

Parcel: 11003081D

Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Date Description Inspector Results Comments
11/03/2017 ASSURANCE - DSD Approved
09/05/2008 ASSURANCE - DSD Partial Approval THE SITE HAS BEEN CHECKED FOR THE INITIAL RELEASE OF THE ASURANCES AND HAS BEEN FOUND TO BE ACCEPTABLE AT THIS TIME. ANOTHER SITE INSPECTION WILL BE REQUIRED ON THIS SITE PRIOR TO THE RELEASES REACHING 75% OF THE SITE TO ENSURE THAT ALL OF THE COMMON AREA WORK IS DONE. CURRENTLY THE FOLLOWING ITEMS HAVE BEEN COMPLETED: P.I.A. ALONG ALVERNON AND FORT LOWELL, THE PAVEMENT FOR THE PARKING AREA, AND THE ON-SITE UTILITIES FOR THE BUILDINGS. I WILL COME BY AND REINSPECT THE SITE IN DECEMBER AFTER MORE OF THE WORK HAS BEEN COMPLETED. IF A FULL RELEASE IS NEEDED PRIOR TO MY SCHEDULED INSPECTION IN DECEMBER THE DEVELOPER WILL NEED TO SCHEDULE A NEW INSPECTION HIMSELF THROUGH THE I.V.R. SYSTEM. CONTACT TAMI HAUSER AT 837-4916 IF YOU HAVE ANY QUESTIONS.
06/20/2008 ASSURANCE - DSD Denied MET WITH MEMBERS OF RICK ENGINEERING AND DISCUSSED THE RELEASE OF BUILDING #113. I HAVE ADVISED DAN CASTRO THAT THE RELEASE OF THE SITE WOULD BE ACCEPTABLE IF THEY WILL PROVIDE A LETTER JUSTIFYING WHY THIS SITE SHOULD BE RELEASED PEIOR TO THE PLACEMENT OF THE P.A.A.L. AND THE ADJACENT PARKING LOTS. THEY HAVE ADVISED ME THAT THEY WILL BE PLACING THE ASPHALT FOR THE PARKING AREAS BY THE FIRST WEEK OF JULY AND WILL NOT BE ASKING FOR ANY ADDITIONAL RELEASES UNTIL THEY HAVE COMPLETED THE PAVEMENT FOR THE SITE. ACCEPTANCE OF THE SITE RELEASE HAS BEEN GIVEN BY MATT FLICK ON 6/24/2008 AND WILL BE ISSUED ACCORDING TO HIS RECOMMENDATION, I HAVE PLACED A COPY OF THE E-MAIL INTO THE RECORD FOR FUTURE REFERANCES OF THE TRANSACTIONS.

John & Dave,

Thanks for getting with me on this one. I've made the decision to release Unit 113 based upon the information obtained from you guys. Tami and I will keep an eye on the inspection results for any future releases.

THIS SITE WILL BE CHECKED PERIODICALLY TO VARIFY THAT THE PAVEMENT HAS BEEN PLACED AND THE INSPECTION FOR THE INITIAL RELEASE CAN BE COMPLETED AT THAT TIME.