Case: S05-207

Parcel: 10510088R


Addresses:

Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Plan Number - S05-207

Inspection Description - ASSURANCE - DSD

Inspection Status - Approved

Date Description Inspector Results Comments
09/25/2009 ASSURANCE - DSD Approved ALL PREVIOUS ASSUR ABLE ITEMS THAT HAVE NOT BEEN CONSTRUCTED AT THIS TIME WILL BE HELD AGAINST THE BUILDING. THESE ITEMS WILL BE CHECKED AND VERIFIED THAT THEY HAVE BEEN CONSTRUCTED PER OUR DEVELOPMENT STANDARDS PRIOR FOR THE SIGNING OF THE C OF O.
09/23/2009 ASSURANCE - DSD Partial Approval THIS SITE HAS BEEN CHECKED AND FOUND TO BE INCOMPLETE FOR THE FULL RELEASE FOR THE FOLLOWING REASONS: 1) ALL CURB AND ROADWAYS FOR THE INDIVIDUAL SITES HAVE NOT BEEN COMPLETED. 2) SIDEWALKS OR STRIPED PEDESTRIAN ACCESS AREAS ARE NOT COMPLETE AT THIS TIME. 3) 3 PADS ON THIS SITE HAVE NOT BEEN DEVELOPED AT THIS TIME AND ARE LACKING PORTIONS OF PREVIOUSLY NOTED ITEMS TO BE ACCEPTABLE FOR OCCUPANCY. A COMPLETION BOND FOR THIS SITE SHOULD BE PROVIDED FOR ALL REMAINING ASSURABLE ITEMS. ALSOLOT LINES FOR ONE OF THE LOTS HAVE BEEN PREVIOUSLY DISCUSSED THAT THEY WILL BE CHANGING LOCATIONS, PLEASE PROVIDE THE NEW FINAL PLAT FOR THESE CHANGES.
06/18/2009 ASSURANCE - DSD Partial Approval THE SITE HAS BEEN CHECKED AND IS APPROVED AT THIS TIME FOR LOT #2. ALL OTHER AREAS ON THIS SITE WILL BE HELD UNTIL ALL REMAINING ASSURABLE ITEMS ARE COMPLETE OR A COMPLETION BOND HAS BEEN INITALIZED FOR ALL REMAINING ITEMS.
01/15/2009 ASSURANCE - DSD Partial Approval LOOKED OVER THE ASSURANCE DOCUMENTS FOR THIS SUBDIVISION AND HAVE DETERMINED THAT AS PER FILING OF THE FINAL PLAT, ALL ASSURABLE ITEMS HAVE NOT BEEN COMPLETED AS NOTED ON THE APPROVED PLANS. FOR THE FINALING OF THE SUBDIVISION ASSURANCES EITHER 1 OF 2 THINGS MUST HAPPEN; 1) COMPLETE ALL ASSURABLE ITEMS AS NOTED IN THE EXHIBITS FOR THE SUBDIVISION AS SHOWN ON ALL APPROVED PLANS. OR 2) CONTACT THIS DEPARTMENT TO DETERMINE WHAT TYPE AND SIZE OF BOND WILL NEED TO BE PLACED IN LIEU TO ALLOW FOR THE RELEASE OF THE REMAINING ASSURANCES.
01/13/2009 ASSURANCE - DSD Partial Approval MET WITH NANCY MOORE AND HAVE DETERMINE THAT I NEED TO LOOK AT THE SUBDIVISION FILE PRIOR TO MAKING A DECISION ABOUT THE FINAL RELEASE.
01/12/2009 ASSURANCE - DSD Partial Approval INSPECTED THE SITE AND HAVE FOUND THAT 3 OF THE SITE PADS HAVE NOT BEEN COMPLETED AT THIS TIME AND THAT THERE MAY BE ADDITIONAL WORK NEEDED PRIOR TO THE FINAL RELEASE OF THIS SITE. I WILL CHECK THE FILES AND MEET WITH REPRESENTATION FROM THE DEVELOPER PRIOR TO MAKING A FINAL DECISION FOR THIS SITE.