Case: S05-180

Parcel: 14026002D


Addresses:

2364 E DREXEL RD


Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Plan Number - S05-180

Inspection Description - ASSURANCE - DSD

Inspection Status - Approved

Date Description Inspector Results Comments
06/29/2012 ASSURANCE - DSD Approved
04/12/2012 ASSURANCE - DSD Partial Approval SITE INSPECTION FOR THIS SITE WILL BE DONE FOR A FULL RELEASE OF THE ASSURANCES AND ANY ASSOCIATED BONDS. A PUNCHLIST OF ITEMS WILL BE CREATED IN THE FUTURE ONCE ALL INSPECTIONS ARE COMPLETE. HAVE CONTACTED RICHARD LEIGH AND ASKED THAT HE HAVE THE INSPECTORS FROM THE PERMITS AND CODES, AND TRAFFIC INSPECTION PERFORM A FINAL INSPECTION FOR THIS SITE.
10/01/2008 ASSURANCE - DSD Partial Approval MALENA AND I LOOKED OVER THE COST ESTIMATE FOR THE SITE AND DISCUSSED WHAT WOULD BE NEEDED IN THE FUTURE DURING MY ABSENCE. THE REMAINING LOTS WILL BE RELEASABLE ONCE THE COMPLETION BOND HAS BEEN ACCEPTED BY MATTHEW FLICK, THE ONLY REQUIRED INSPECTIONS WILL BE ALL REQUIRED INSPECTIONS TO CLOSE OUT THE FINAL GRADING PERMIT, AND THE FINAL INSPECTION FOR THE ASSURANCE COMPLETION BOND.
09/25/2008 ASSURANCE - DSD Partial Approval BILL REYNOLDS WITH D.R. HORTON HAS PROVIDED AN ESTIMATE FOR THE REMIANING ASSURABLE ITEMS FOR THIS SITE. THE SITE HAS BEEN CHECKED FOR QUANTITY VARIFICATION AND HAS BEEN FOUND TO BE ACCEPTABLE OFR THE AMOUNTS SUBMITTED. THE ESTIMATE AMOUNT THAT HAS BEEN PROVIDED FOR THIS COMPLETION BOND IS $54,124.00, COVERING ALL REMAINING SIDEWALKS, DRIVEWAYS, AND SIGNS REMAINING TO BE INSTALLED. THIS SITE WILL BE REQUIRED THE FOLLOWING LIST OF ITEMS PRIOR TO THE FINAL RELEASE OF ALL BONDS: 1) A FINAL INSPECTION OF ALL THE ASSURABLE ITEMS THAT HAVE BEEN INSTALLED ON THIS SITE TO ENSURE THAT THEY HAVE BEEN COMPLETED AND ARE IN ACCEPTABLE CONDITION. 2) A LETTER OF CERTIFICATION FOR THE SITE FROM THE ENGINEER OF RECORD IN REGARD TO HOW THE SITE WAS CONSTRUCTED. 3) A SET OF AS-BUILT DRAWINGS FOR ALL WORK THAT HAS BEEN CHANGED THROUGHOUT THE COURSE OF CONSTRUCTION. THIS IS NOT REQUIRED IF NO CHANGES HAVE BEEN MADE FROM THE APPROVED SET OF THE CONSTRUCTION PLANS. 4) COMPLETE THE GRADING INSPECTION FOR THE SITE AND CLOSE OUT THE OPEN GRADING PERMIT, CLEAR ANY/ALL OPEN PERMITS FOR THIS SITE.
06/24/2008 ASSURANCE - DSD Partial Approval THIS SITE HAS BEEN INSPECTED FOR THE INITIAL RELEASE AND HAS BEEN FOUND TO BE ACCEPTABLE AT THIS TIME. THIS SITE WILL NEED TO BE RE-INSPECTED PRIOR TO THE FINAL RELEASE OF THE ASSURANCES TO VERIFY THAT ALL COMMON WORK HAS BEEN COMPLETED OR THAT A COMPLETION BOND IS POSTED FOR ALL REMAINING ITEMS.