Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: ASSURANCE - DSD
| Date |
Description |
Inspector |
Results |
Comments |
| 08/10/2011 |
ASSURANCE - DSD |
|
Approved |
|
| 12/14/2010 |
ASSURANCE - DSD |
|
Correction Required |
MET ON-SITE WITH THE ENGINEER OF RECORD PAUL NZOMO AND KEVIN TOBARA (520) 740-2651 PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT TO DISCUSS WHAT WILL BE HAPPENING IN THE FUTURE. THEY WILL BE FILMING THE SEWER LINES TO VERIFY WHAT HAS BEEN DONE TO THEM, INSPECT AS NEEDED, AND PROVIDE US WITH A SET OF AS-BUILT DRAWINGS PRIOR TO ANY ADDITIONAL RELEASES BEING GRANTED. tHERE IS A CONTRACTOR BEING RETAINED TO COMPLETE THE WORK ONCE IT HAS BEEN DECIDED WHAT NEEDS TO BE DONE. |
| 09/24/2009 |
ASSURANCE - DSD |
|
Correction Required |
NO ADDITIONAL SITES ARE TO BE RELEASED UNTIL THE PIMA COUNTY WASTE WATER DEPARTMENT HAS PROVIDED THIS DEPARTMENT WITH A RELEASE LETTER. |
| 02/08/2008 |
ASSURANCE - DSD |
|
Partial Approval |
LOOKED OVER THE SITE TO SEE WHAT HAS BEEN HAPPENING IN THE PAST FEW MONTHS. APPROXIMATELY 6 LOTS REMAIN TO BE CONSTRUCTED ON AT THIS TIME, THE ROADWAY STILL NEEDS TO HAVE THE FINAL COURSE INSTALLED. IT IS MY RECOMMENDATION THAT ALL FUTURE RELEASES BE BASED OFF THE DEVELOPER WORKING TO COMPLETE THE ROADWAY FULLY PRIOR TO ANY OTHER RELEASES. I WILL CONTINUE TO CHECK THIS SITE UNTIL ALL OF THE WORK WITHIN THE COMMON AREAS IS COMPLETED. |
| 11/30/2006 |
ASSURANCE - DSD |
|
Partial Approval |
THE SITE WAS CHECKED TO VERIFY THAT THE SITE IS READY FOR THE INITIAL RELEASE OF THE ASSURANCES. THE DEVELOPER HAS COMPLETED THE INSTALLATION OF THE UTILITIES, ROADWAYS(1ST LIFT), CURBS, AND ROUGH GRADING OF THE DETENTION/RETENTION BASINS AND DRAINAGEWAYS SO ALL LOTS CAN BE CONSIDERED FOR THE INITIAL RELEASE. THE ROADWAYS HAVE BEEN PAVED ON THE LOWER 1/2, THE REMAINING ASPHALT WILL BE COMPLETED ONCE MOST OF THE SITE WORK IS COMPLETED. THE DRAINAGEWAYS AND BASINS HAVE BEEN CONSTRUCTED BUT HAVE NOT BEEN FINALED. A REINSPECTION OF THE SITE WILL BE REQUIRED PRIOR TO GOING PAST THE 75% INITIAL RELEASE. |