Case: S04-181

Parcel: 133390370


Addresses:

687 S BONANZA AV


Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Plan Number - S04-181

Inspection Description - ASSURANCE - DSD

Inspection Status - Approved

Date Description Inspector Results Comments
11/16/2007 ASSURANCE - DSD Approved THIS SITE HAS BEEN CHECKED AND FOUND TO BE COMPLETE AT THIS TIME. THE GRADING PERMIT FOR THIS SITE WAS CLOSED ON 8/6/2007 WITH NO ADDITIONAL COMMENTS.
04/20/2007 ASSURANCE - DSD Partial Approval THIS SITE WAS CHECKED FOR THE FULL RELEASES OF THE ASSURANCES AND WILL REQUIRE THE FOLLOWING ITEMS TO BE ADDRESED PRIOR TO THE FINAL APPROVAL.
1) A COMPLETION BOND WILL BE REQUIRED FOR THE REMAINING SIDEWALKS, DRIVEWAYS, AND ANY OTHER INCOMPLETE ASSURABLE ITEM.
2) GENERAL CLEANUP OF THE PROJECT LIMITS FROM ALL EXCESSIVE CONSTRUCTION MATERIALS THAT ARE BEING UTILIZED ON THE SITE AT THIS TIME.
3) A CERTIFICATION LETTER FOR ALL DRAINAGE ITEMS NEEDS TO BE SUBMITTED BY THE SIGNING ENGINEER FOR THIS PROJECT.
10/26/2006 ASSURANCE - DSD Partial Approval THIS SITE WAS CHECKED FOR THE FULL RERLEASES, BUT IS NOT APPROVABLE AT THIS TIME. THE FOLLOWING ITEMS NEED TO BE ADDRESSED PRIOR TO THE FINAL RELEASE OF ALL OF THE ASSUNCES: 1) A COMPLETION BOND WILL BE REQUIRED FOR THE REMAINING SIDEWALKS, DRIVEWAYS, AND ANY OTHER INCOMPLETE ASSURABLE ITEM. THIS WILL ALSO INCLUDE GENERAL CLEANUP OF THE PROJECT LIMITS FROM ALL EXCESSIVE CONSTRUCTION MATERIALS THAT ARE BEING UTILIZED ON THE SITE AT THIS TIME. 2) A CERTIFICATION LETTER FOR ALL DRAINAGE ITEMS NEEDS TO BE SUBMITTED BY THE SIGNING ENGINEER FOR THIS PROJECT.
07/27/2006 ASSURANCE - DSD Partial Approval THIS SITE HAS BEEN INSPECTED FOR THE INITIAL RELEASE OF THE FOLLOWING LOTS: 1, 2, 4-6, 8-11, 14-17, 19-25, AND 27. THE RELEASE OF THESE LOTS WILL BRING THE PROJECT RELEASES UPTO 75%. NO OTHER LOTS CAN BE RELEASED UNTIL THE FOLLOWING INSPECTIONS HAVE BEEN COMPLETED AND APPROVED: FINAL ASSURANCE INSPECTION, FINAL GRADING INSPECTION, BASIN CERTIFICATION LETTER, AND THE RELEASES FROM ALL OTHER DEPARTMENTS.