Case: S04-178

Parcel: 10825007D


Addresses:

2008 E RIVER RD


Inspection Status: Partial Pass

Inspection History: COT - ENGR - Site - Assurance Release

Plan Number - S04-178

Inspection Description - COT - ENGR - Site - Assurance Release

Inspection Status - Partial Pass

Date Description Inspector Results Comments
07/29/2022 COT - ENGR - Site - Assurance Release BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Building two unit 105 and 205 OK for release
07/15/2022 COT - ENGR - Site - Assurance Release BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Placita Escondida Condominiums. Building 14 Units 100 thru 105 and 200 thru 205, and Garage units G1 thru G10, Storage units S1 thru S8. Buildings 1 thru 20. Common Areas iAi (vehicular use), iBi (landscape), iCi (limited use open space), and iDi (recreation). (formerly iRio Vista, a co-housing neighborhoodi).
05/20/2022 COT - ENGR - Site - Assurance Release BBENEDON Partial Approval Entered by NGARCIA3 - partially approved OK for release of all condo units in building 13 as noted.
03/02/2022 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by NGARCIA3 - PARTIAL OK TO RELEASE UNIT 205 IN BUILDING #4.
03/02/2022 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by RSALDAT1 - IS PARTIAL OK TO RELEASE UNIT 205 IN BUILDING #4.
02/04/2022 COT - ENGR - Site - Assurance Release BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Unit one zero one, building 10. OK for release.
12/28/2021 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT5 - PARTIAL AT THIS TIME, OK TO RELEASE BUILDING #5uNIT #205
12/23/2021 COT - ENGR - Site - Assurance Release BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. No access to building
09/10/2021 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT5 - IS PARTIAL AT THIS TIME, OK TO RELEASE Units 103 and 204 in Building 100, ALL OTHER UNITS WILL NEED TO BE INSPECTED PRIOR TO RELEASE
09/07/2021 COT - ENGR - Site - Assurance Release DROBERTS Denied Entered by RSALDAT1 - DENIED, COMPLETE ALL OTHERE INSPECTIONS FOR THIS PERMIT PRIOR TO SCHEDULING THIS INSPECTION AGAIN
01/28/2010 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - APPROVED FOR THE RELEASE OF THE NEXT BUILDING THAT HAS BEEN CONSTRUCTED(10), BUT NOT FOR A FULL RELEASE OF THE SITE. SEE THE PREVIOUS COMMENTS FOR SOME OF THE THINGS THAT ARE REMAINING PRIOR TO A FULL RELEASE. IF A FULL RELEASE OF THIS SITE IS SOUGHT AT THIS TIME, PLEASE PROVIDE A ITEMIZED COST ESTIMATE FOR ALL REMAINING INCOMPLETE ASSURABLE ITEMS FOR VERIFICATION BY THIS DEPARTMENT. TO THIS DATE THE FOLLOWING BUILDINGS (1-5, & 10) HAVE BEEN CLEARED FOR RELEASE. ALL OTHERS WILL STILL NEED TO BE CONSTRUCTED AND THEN REQUESTED FOR INSPECTION BEFORE THEY WILL BE CONSIDERED.
06/10/2009 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THE SITE HAS BEEN CHECKED UTILIZING THE DOCUMENTS THAT HAVE BEEN FORWARDED SHOWING THE NEW LAYOUT OF THE SUBDIVISION OR PHASING OF THE SITE. THESE DOCUMENTS HAVE BEEN PLACED INTO SIRE FOR FUTURE REFERENCE AND CLARIFICATION OF MY UNDERSTANDING FOR THIS CURRENT INSPECTION REQUEST. FOR THE RE-SUBDIVIDING/PHASING OF THE CURRENT PROJECT IT HAS BEEN FOUND TO BE COMPLETE IN THE FOLLOWING AREAS: 1) THE PAAL'S, AND SOME COMMON AREAS HAVE BEEN SUBSTANTIALLY COMPLETED AT THIS TIME THROUGHOUT THE SITE. THE ONES THAT ARE MOSTLY IN NON-COMFORMANCE AT THIS TIME ARE LOCATED IN THE EASTERN HALF OF THE SITE. 2) THE STORAGE FACILITY NORTH OF BUILDING 1 HAS BEEN CONSTRUCTED AND APPEARS TO BE OPERATIONAL. 3) BUILDINGS 1 THROUGH 5 HAVE BEEN CONSTRUCTED AND INSPECTED FOR OCCUPANCY, THE COMMON AREAS APPEAR TO BE COMPLETE. 4) COMMON AREA "D" (POOL FACILITY) HAS BEEN COMPLETED AND IS OPERATIONAL AT THIS TIME. FOR THIS SITE TO BE FULLY RELEASED OF THE ASSURANCES IT WILL REQUIRE A FULL INSPECTION OF THE SITE, NOTING ANY CHANGES THAT HAVE BEEN MADE IN THE LAYOUT OF THE SITE, AND ALL CURRENT DAMAGES THAT MAY EXIST IN THE CONSTRUCTED ASSURABLE ITEMS. ALL DAMAGES WILL HAVE TO BE REPAIRED OR MAYBE HELD ACCOUNTABLE TILL THE FULL SITE HAS BEEN CONSTRUCTED. PLEASE CONSULT JIM VOGELSBURG OR MATTHEW FLICK ON THIS MATTER TO OBTAIN CLARIFICATION OF ALL ASSURABLE ITEMS.
03/04/2008 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THIS SITE WAS CHECKED FOR ADDITIONAL RELEASES OF THE LOTS WITHIN AND HAS FOUND TO BE COMPLETE FOR BUILDINGS 1-4, ALL OTHER BUILDINGS LIE WITHIN THE CONSTRUCTION FENCE. THE RELEASE OF ANY OTHER BUILDINGS ON THIS SITE WILL REQUIRE THAT THEY BE SEPERATED FROM THE AREAS UNDER CONSTRUCTION AND THAT A REINSPECTION IS PERFORMED PRIOR TO ANY OTHER RELEASES.
01/11/2008 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THIS SITE WAS CHECKED FOR ADDITIONAL RELEASES OF THE LOTS WITHIN AND HAS FOUND TO BE INCOMPLETE AT THIS TIME FOR ADDITIONAL RELEASES. BUILDINGS 1-3 HAVE BEEN COMPLETED AND RESIDE OUTSIDE OF THE CONSTRUCTION FENCING FOR THIS SITE, ALL OTHERS LIE WITHIN THE CONSTRUCTION FENCE. THE RELEASE OF ANY OTHER BUILDINGS ON THIS SITE WILL REQUIRE THAT THEY BE SEPERATED FROM THE AREAS UNDER CONSTRUCTION.
10/10/2007 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THE SITE HAS BEEN INSPECTED FOR THE RELEASE OF BUILDING #3 AND #4. IT IS APPROVED AT THIS TIME FOR BLDG.#3, BLDG #4 CAN BE RELEASED ONCE THE CONSTRUCTION FENCE HAS BEEN REMOVED AND IT IS RE-INSPECTED TO ASSURE ACCEPTABLE ACCESS.
08/22/2007 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE INITIAL RELEASE OF BUILDINGS #3-#5, IT IS NOT READY AT THIS TIME. THIS INSPECTION HAS BEEN DENIED AT THIS TIME DUE TO THE AMOUNT OF ON GOING CONSTRUCTION ADJACENT IN AND AROUND THE BUILDINGS. MINOR ISSUES HAVE BEEN DISCUSSED WITH THE DEVELOPER THAT NEED TO BE CORRECTED PRIOR TO THE FINAL RELEASE OF ALL SITE WORK. A REINSPECTION OF THIS SITE WILL BE REQUIRED PRIOR TO ANY ADDITIONAL RELEASES FOR ALL BUILDINGS NOT PREVIOUSLY RELEASE.
03/20/2007 COT - ENGR - Site - Assurance Release MRUSSO Partial Approval Entered by THAUSER1 - SITE INSPECTION OK FOR PARTIAL RELEASE FOR BUILDINGS 1 & 2. CURBS, ROADWAYS AND UTILITIES ARE IN FOR THESE TWO BUILDINGS.
05/12/2023 COT - ENGR - Site - Assurance Release Passed
COT - ENGR - Site - Assurance Release Requested
04/05/2024 COT - ENGR - Site - Assurance Release Passed
04/24/2024 COT - ENGR - Site - Assurance Release Passed
05/04/2023 COT - ENGR - Site - Assurance Release Passed OK for the release of assurances for the following buildings and units, Units 100 thru 105 and Units 200 thru 205 Bldg 16
05/04/2023 COT - ENGR - Site - Assurance Release Passed OK for the release of the insurances for the following buildings and units Units 100 thru105 and Units 200 thru 205 Building 17

Complete the pedestrian access to all units of the building from the adjacent parking lot and complete the ADA parking in that parking lot. The contractor will reschedule this inspection in one to two weeks when he’s ready for the approvals
08/04/2023 COT - ENGR - Site - Assurance Release Not Ready Denied due to no one is on-site at this time, Building 15 Units 100-105 and 200-205 Appears to be under Construction at this time
09/06/2023 COT - ENGR - Site - Assurance Release Re-inspection required Building 15 Units 100-105 and 200-205 ok for release
09/15/2023 COT - ENGR - Site - Assurance Release Passed Ok to Release Building 15 for the assurances
09/24/2025 COT - ENGR - Site - Assurance Release Passed